Orange County NC Website
P a g e 16 o f 2 3 <br />Criterion 3 - Efficient use of Funds <br /> supported by the trend already observed since the start of the <br />project. The numbers of waste drop-offs have risen dramatically <br />since the start of collection (400% in 3 months). This site will <br />continue well into the future unless funding is no longer available <br />for the pick-up and composting of food waste that is collected. <br />22. Please describe the location of <br />the emissions reduction. Where <br />would fossil fuels have been <br />burned if not for your project? <br />For projects creating electricity <br />usage reductions, it can be <br />difficult to determine the <br />location of the power <br />produced. Please feel free to <br />state “Grid-tied electricity <br />reduction” <br />Emissions will be reduced in Orange County and in surrounding <br />counties that utilize the finished product —rich, carbon- <br />sequestering compost. Methane emissions will be reduced in the <br />mega-landfill in Sampson County where Orange County waste is <br />taken. Residents in Hillsborough and the surrounding area will <br />reduce carbon emissions in Orange County as a result of not <br />having to drive to a more distant site to drop off compostables. <br />23. Please describe any other <br />aspect of your project that is <br />relevant to the amount of <br />emissions that it will reduce or <br />avoid. <br />There will be less food waste being transported to the distant <br />landfill in Sampson County, further reducing GHG <br />emissions. <br /> <br /> <br />1. Please estimate the impact of your project per grant dollar requested. <br />This cost per unit of impact must reflect the total program budget divided by the total impact of <br />the project described in this application. If the proposed project is new, please write N/A in the <br />first column of the table below, and just fill out the second column. <br /> Actual Annual Project <br />Costs <br />(If your proposed project <br />expands or accelerates an <br />ongoing effort) <br /> <br />Projected Project Costs <br />Total Cost of Project N/A $4,000.00 <br />Unit of Impact: <br />Total # of tons of greenhouse gases reduced N/A 37.64 metric tons CO2 <br />Cost Per Ton of GHG’s Reduced N/A $106.27 <br />Unit of Impact: <br />Total # of individuals served/benefitted N/A 5,200+ <br />Cost Per Individual Served/Benefitted N/A .02 <br />Other Unit of Impact: Please describe here <br />Cost Per Unit of Impact <br />Other Unit of Impact: Please describe here <br />Cost Per Unit of Impact <br />(Please feel free to add rows if necessary to show any additional units of impact.) <br />DocuSign Envelope ID: AFC9D9B8-B7DD-46DF-8603-54762363FD20