Orange County NC Website
11 <br /> fees, furniture, fixtures, and equipment and a five percent (5%) owner's contingency brings the <br /> total project budget to $41,174,840. Based on the County's dedicated space in the building, <br /> associated parking, and the County's share of common areas, the County's total project cost is <br /> $22,218,882 as shown in the following table: <br /> Town Orange County Total <br /> A.Construction <br /> Total Construction&CMAR $15,490,004.00 $19,202,063.00 $34,692,067.00 <br /> B.Design <br /> Architectural Fees(Ratio of CBO/OC Sq. Ft. =44.52/55.48) $752,074.13 $937,220.87 $1,689,295.00 <br /> Supp.Architectural Fees(Ratio of CBO/OC Sq. Ft.=44.52/55.48) $252,784.56 $315,015.44 $567,800.00 <br /> $1,004,858.69 $1,252,236.31 $2,257,095.00 <br /> C.FFE&Contingency <br /> Furniture,Fixtures and Equipment(FF&E) $1,688,850.00 $802,225.00 $2,491,075.00 <br /> Owner's Contingency(5%) @ Ratio of CBO/OC 44.52/55.48 $772,245.00 $962,358.00 $1,734,603.00 <br /> Subtotal FFE&Contingency $2,461,095.00 $1,764,583.00 $4,225,678.00 <br /> TOTAL Project Budget $18,955,957.69 $22,218,882.31 $41,174,840.00 <br /> Orange County's share of the project construction budget overrun is approximately $4,968,033. <br /> The Owner's Contingency, based upon a 5% of the GMP, rose from $530,050 to $962,358, an <br /> additional $432,300. The total project budget impact is an increase of $5,400,333. Additional <br /> operating costs for the new Library are currently estimated to be $537,670 in the first full year of <br /> operation. <br /> Additional Options for Consideration <br /> On March 1, staff presented an option to shell in the County's portion of the facility. That option <br /> would produce approximately $1.6 million in total savings but would result in unusable <br /> programming spaces until additional funding is allocated to finish the space. Based on the <br /> Board's discussion, staff discussed two additional options to reduce the scope of the project <br /> and decrease the required budget. <br /> Option 1: Delete the Orange County Skills Development Center from the project with <br /> minimal redesign. <br /> This option would entail the removal of one level from the building and one level of the parking <br /> deck. This option keeps the current design mostly intact. The estimated time for redesign is <br /> five months plus an additional two months for re-permitting and bidding. The minimal redesign <br /> option would cost approximately $605,000 in architectural fees. The Construction Manager <br /> estimates a construction cost savings of approximately$3,765,000. <br />