Orange County NC Website
Technical Committee 1/26/2022 Item 14 <br /> 47 <br /> NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> P-5701 Construct Platform, Passenger Rail Station Building at 6/30/2022 FY2024 $7,200,000 PE funding scheduled 7/1/2020 Matthew Simmons <br /> 46395.1.1 Milepost 41.7 Norfolk Southern H-line in Hillsborough <br /> 46395.3.1 <br /> SS-6007V Intersection improvements(all-way stop)on SR 1567 7/14/2021 6/30/2022 $90,000 All routes completed 11/17/21. Pending Dawn McPherson <br /> 49706.3.1 (Pleasant Green Road)at SR 1569 (Cole Mill Road);on SR final inspection by Regional Traffic <br /> 1548(Schley Road)at SR 1538(New Sharon Church Road); Engineer. <br /> on SR 1507(Wilkerson Road)at SR 1545(Sawmill Road); <br /> and on SR 1114 (Buckhorn Road)at SR 1120(Mt. Willing <br /> Road). <br /> SS-6007R Traffic signal revisions and high visibility crosswalk Dec. 2022 11/18/2022 $12,600 Pavement markings completed by NCDOT Dawn McPherson <br /> 49557.1.1 installation on SR 1010 (East Franklin Street)at Henderson Apr. 2023 on 11/18/21. Town of Chapel Hill <br /> 49557.3.1 Street. Outside WB through lanes on Franklin Street at implemented timing changes. Pending <br /> Henderson Street will be modified for temporary Covid final inspection by Regional Traffic <br /> accommodations, and will be restored to existing multi-lane Engineer. <br /> pattern by May 2022 to coincide with adjacent resurfacing <br /> project. <br /> SS-6007AD Convert intersection from two way stop to all way stop at the Apr. 2022 Sep. 2022 $28,000 Planning and design activities underway Dawn McPherson <br /> 49823.1.1 intersection of SR 1710(Old NC 10)and SR 1712 (University <br /> 49823.3.1 Station Road)west of Durham <br /> SS-4907CD Horizontal curve improvements on SR 1710(Old NC 10) Jun. 2022 Nov. 2022 $261,000 Planning and design activities underway Chad Reimakoski <br /> 47936.1.1 west of SR 1561/SR 1709(Lawrence Road)east of <br /> 47936.2.1 Hillsborough. Improvements consist of wedging pavement <br /> 47936.3.1 and grading shoulders. <br /> 1-5958 Pavement Rehabilitation on 1-40/1-85 from West of SR 1114 11/17/2026 FY2028 $8,690,000 PE funding approved 10/10/17 Chad Reimakoski <br /> 45910.1.1 (Buckhorn Road)to West of SR 1006 (Orange Grove Road) <br /> 45910.3.1 <br /> 1-5967 Interchange improvements at 1-85 and SR 1009(South 10/19/2027 FY2030 $16,900,000 PE funding approved 9/8/17, Planning and Laura Sutton <br /> 45917.1.1 Churton Street)in Hillsborough Design activities underway, Coordinate <br /> 45917.2.1 with 1-0305 and U-5845 <br /> 45917.3.1 <br /> Page 1 DCHCMPO Dec.2021 <br />