Browse
Search
2.16.22 OUTBoard Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2022
>
2.16.22 OUTBoard Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 4:49:55 PM
Creation date
4/22/2022 4:48:19 PM
Metadata
Fields
Template:
BOCC
Date
2/16/2022
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
2.16.22 OUTBoard Minutes
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> DURHAM CHAPELHILL CAIMORO <br /> Bicycle and Pedestrian IDCHC- <br /> HIMP"AN PU NJNGORGMW!AJON <br /> The level of bicycle and pedestrian ' <br /> Y p BikelPed Costs to complete local plans <br /> facility investment is based on a <br /> Length <br /> review of the MPO's local { :unit Cost TotalCast <br /> government plans. (mi) :(ft) ($millions) <br /> Sidewalk 525 $ 250 $ 693 <br /> 175 miles of sidewalk per decade Shared Use <br /> 70 miles of shared use paths per decade Path/Sidepath 210 $ 500 $ 554 <br /> 80 miles of protected bike lanes per decade Protected bike lane <br /> (bath sides) 240 ; $ 1,200 $ 1,521 <br /> 20 miles of bicycle boulevards per decade .. ..... .. ..... ......... ... .......... .................... ................... <br /> Bicycle Boulevard 60 $ 10 $ <br /> Note: <br /> Total $ 2,771 <br /> Bicycle and pedestrian projects are usually not listed or <br /> mapped in the MTP Costs to complete local plans <br /> Report appendix will list regional routes. (because <br /> SPOT awards regional points) <br /> $292m in costs in 2045 MTP Roadwa s&Alternative Trans r-tatian I 2030 2040 2050 Total <br /> Bic cle and Pedestrian 15 140 1291 1340 5 2 771 <br /> Roadways and Alt.Transportation Balance) 101 0 s 1 102 <br /> Balance for the non-transit section of the financial plan <br /> will essentially be zero for 2040 and 2050 decade. <br /> ORANGE COUNTY <br /> NORTH CAROLINA <br />
The URL can be used to link to this page
Your browser does not support the video tag.