Orange County NC Website
DocuSign Envelope ID: FC9986C3-F179-4A3D-BACO-D8CA9F8B93A7 <br /> 1"tAC <br /> Drilling - Direct Push - Remediation Services <br /> 9088 Northfield Drive <br /> Fort Mill, South Carolina 29707 <br /> Phone: (803) 548-2180/ Fax: (803) 548-2181 <br /> www.saedacco.com <br /> Proposal <br /> S&ME,Inc.-Raleigh RE: Hillsborough Landfill <br /> 3201 Spring Forest Road Torain Street <br /> Raleigh,NC 27616 Hillsborough,NC <br /> Phone:(919)872-2660/Fax:(919)876-3958 <br /> Email:traymond@smeinc.com <br /> ATTN:Tom Raymond,P.E. FROM:Kevin Howell(khowell@saedacco.com) <br /> Project Date: 1/31/2022 <br /> Last Revised Date:1/31/2022 <br /> Job Number: <br /> Description/Unit Quantity Rate Extension <br /> Scope of Work : Installation of nine Type II 2" SCH 40 PVC monitoring wells to approximately 15 to 30 feet <br /> below ground surface (bgs-175 linear feet) completed with 2x2 concrete pads and stick up covers. Optional <br /> pricing included for installing one Type III 211 SCH 40 PVC telescoping wells with 6" galvanized steel surface <br /> casings installed to approximately 30 feet bgs completed with a 2x2 concrete pad and stick up cover. <br /> Installation of 12 Type II 1" SCH 40 PVC landfill gas probes to approximately 11 feet bgs completed with a <br /> locking expansion plug and brass lock. <br /> TRAVEL: <br /> Per Diem (3 people X 8 nights) 24 $130.00 $3,120.00 <br /> Rig & Crew Mob/Demob, lump sum 1 $750.00 $750.00 <br /> SOIL BORINGS / WELLS: <br /> Materials for 9 Type II Monitor Wells (2" PVC) 15' - 30' 175 $25.00 $4,375.00 <br /> bgs, screen, end cap, sand, bentonite, grout) , per foot <br /> Materials & cost for one Type III Monitor Well (6" 20' <br /> outer steel casing, 30' 2" well & screen, sand, 30 $55.00 $1,650.00 <br /> bentonite, grout) <br /> Materials for 12 Gas Probes to 11' bgs (1" PVC casing, <br /> screen, end cap, #3 sand, bentonite seal) , (stickups) , 132 $20.00 $2,640.00 <br /> per foot <br /> Stickup Surface Completions, 3' stickup covers, 2' x2' 21 <br /> concrete pads, locks (9 wells and 12 gas probes), each $175.00 $3,675.00 <br /> Compressor for Air Drilling, per day 2 $1,500.00 $3,000.00 <br /> Rig Unit (Diedrich D-50 Rotary Auger Drill) & Crew, <br /> Includes labor and decontamination supplies for soil 10 $2,500.00 $25,000.00 <br /> characterization borings, per day <br /> OTHER: <br /> 55-Gallon Drums, each 8 $85.00 $680.00 <br /> IDW Management (Rental Equipment) , lump sum 1 $3,750.00 $3,750.00 <br /> 6' tall security fence and wood pallets, each 1 $450.00 $450.00 <br /> Return to pick up drums and pallets, lump sum 1 $750.00 $750.00 <br /> Total Estimated Cost: $49,840.00 <br /> Time Estimate - 10 Days <br />