Orange County NC Website
DocuSign Envelope ID: FC9986C3-F179-4A3D-BACO-D8CA9F8B93A7 <br /> Proposal for Additional Remedial Investigation <br /> Hillsborough Dump <br /> l: &meow ID No. NONCD0000483 <br /> Task Orders 483DP-19 thru 25 <br /> S&ME Project No.4305-17-061G <br /> S&ME will subcontract a North Carolina Licensed Professional Land Surveyor(McKim &Creed) to survey the 9 <br /> groundwater monitor wells (including the top of casing and ground surface elevations). <br /> Sampling Groundwater Monitor Wells(9): Ground water samples will be collected, and the samples analyzed <br /> according to the methods presented in Task 483DP-22 above. <br /> Landfill Gas Probe Installations (12) <br /> Twelve additional permanent gas probes (GP-11 through GP-22) are proposed to be installed at the approximate <br /> locations shown on Figure 1. The gas probes will be installed as follows: <br /> A decontaminated 3 '/4" or 4'/4"diameter auger will be extended with a Geoprobe unit up to eleven feet <br /> bgs.The bottom of the PVC well screen will be installed at least two feet or more above the estimated <br /> groundwater table elevation. If the estimated groundwater table is expected to be less than 13 ft. bgs, <br /> adjustments to the length of well screen will be made. (If the depth to the estimated groundwater is too <br /> shallow to allow at least a five-foot distance between the bottom of the bentonite seal and the top of the <br /> ground surface, a gas probe will not be installed. The Unit Project Manager will be contacted in this case <br /> and a Flux Chamber may be installed (if requested) instead of a gas probe. <br /> A one to five-foot long 1-inch diameter,0.010-inch slot screen with 1-inch diameter PVC well casing will <br /> be placed into the open boring. <br /> o If the well screen is shortened to accommodate shallow groundwater, a push cap will be placed <br /> onto the cut bottom of the well screen. <br /> o Each gas probe will be fitted with a slip cap outfitted with a quick connect fitting to facilitate <br /> sample collection. The inside end of the quick connect fitting will be connected to a section of <br /> dedicated Teflon lined tubing that will extend down to the screened interval of each probe. <br /> o Coarse sand (#3 sand)will be tremmied into the annulus around the PVC screen and casing from <br /> the bottom of the boring up to approximately one foot above the top of the screen. <br /> o A one-foot thickness of bentonite pellets will be poured into the boring around the PVC casing <br /> from the top of the sand to one foot above the sand. The landfill gas probe will be installed to <br /> ensure that there is at least four feet from the top of the bentonite to the ground surface. <br /> Approximately one gallon of clean water will be poured into the boring to hydrate the bentonite <br /> seal. <br /> o Soil from the drill cuttings will be packed into the boring from the top of the bentonite layer to <br /> the ground surface. This soil layer will be at least four feet thick. <br /> The gas probes will be finished as permeant sampling points with concrete pads, stick-up protective steel <br /> casings and locks. <br /> Landfill Gas Probe Sampling (12): Landfill gas probes will be sampled and analyzed according to the methods <br /> presented in Task 483DP-22 above. <br /> Investigative Derived Waste <br /> Investigative derived waste (IDW)extracted from a boring will be placed back in the boring unless groundwater <br /> was encountered. Per the OCHD Rules, grout will be used to backfill borings that intersect the water table. <br /> March 10, 2022 8 <br />