Browse
Search
2022-154-E-DEAPR-S&ME, INC-Additional remedial investigation at former Hillsborough landfill
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-154-E-DEAPR-S&ME, INC-Additional remedial investigation at former Hillsborough landfill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 2:39:22 PM
Creation date
4/22/2022 2:37:47 PM
Metadata
Fields
Template:
Contract
Date
4/18/2022
Contract Starting Date
4/18/2022
Contract Ending Date
4/22/2022
Contract Document Type
Contract
Amount
$122,032.10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: FC9986C3-F179-4A3D-BACO-D8CA9F8B93A7 <br /> Anew <br /> March 10, 2022 <br /> Orange County <br /> Department of Environment Agriculture, Parks and Recreation <br /> 306 A Revere Road/PO Box 8181 <br /> Hillsborough, NC 27278 <br /> Attention: Mr.Wesley Poole via email: wpoole@orangecountync.gov <br /> Water Resources Coordinator <br /> Reference: Work Plan&Cost Estimate for Additional Remedial Investigation <br /> Task Orders 483DP-19 Through 483DP-25 <br /> Hillsborough Dump <br /> 195 Torain Street, Hillsborough, North Carolina <br /> ID No. NONCD0000483' <br /> S&ME Proposal No.43-20000048,CO-7 <br /> S&ME Project No.4305-17-061G <br /> Dear Mr. Poole: <br /> S&ME, Inc. (S&ME), appreciates the opportunity to provide this work plan and cost estimate to conduct additional <br /> Remedial Investigation activities at the Hillsborough Dump site in Hillsborough, North Carolina. This work plan <br /> presents our understanding of the project,a proposed scope of services, an estimated project budget and <br /> schedule. These services will be performed according to the terms of the Consulting Services Agreement, dated <br /> April 15, 2019, between the Orange County and S&ME. We understand Orange County will issue a Task <br /> Authorization or Purchase Order as acceptance of this proposed work plan and cost estimate. <br /> Project Background <br /> The Hillsborough Dump is a closed, unlined PRLF that was owned and operated by the Town of Hillsborough and <br /> accepted municipal waste from the early 1940's to approximately 1975. The current estimated landfill area is <br /> approximately 20 acres located north of the intersection of Torain Street and Rainey Avenue, on property owned <br /> by Orange County and the Town of Hillsborough. <br /> S&ME previously conducted remedial investigation activities including geophysical surveying, above-ground <br /> vapor screening, stream and sediment sampling,waste delineation with borings, landfill gas sampling and monitor <br /> well installations as documented in the following reports submitted to Orange County(hereafter"the County'): <br /> Remedial Investigation—First Phase Report—Hillsborough Dump Pre-Regulatory Landfill,January 24, 2018. <br /> Remedial Investigation—Waste Boundary Delineation Report—Hillsborough Dump Pre-Regulatory Landfill, <br /> October 31, 2018. <br /> Remedial Investigation—Above-Ground Landfill Gas Survey and Stream Sampling Report—Hillsborough <br /> Dump,January 9,2019. <br /> Remedial Investigation—Monitor Well Installations—Hillsborough Dump,June 25, 2019. <br /> Remedial Investigation Report—Groundwater Sampling—Hillsborough Dump,July 11, 2019. <br /> S&ME, Inc.13201 Spring Forest Road I Raleigh,NC 27616 1 p 919.872.2660 1 www.smeinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.