Orange County NC Website
ARPA Sourced 02-22 V3 <br /> <br />participate with the County in negotiation and design adjustments to the extent such are <br />necessary to obtain prices within the approved total project cost. All activity of the <br />Provider with respect to these matters shall constitute Basic Services and shall be <br />performed by the Provider without additional compensation. If negotiation and design <br />adjustments fail to bring costs within the total project cost the County may reject all bids <br />and Provider will redesign or reduce portions of the project in an effort to reduce the bid <br />prices to within the total project cost and rebid the project. One such redesign is included <br />within Basic Services. If this second letting for bids does not produce bids that are within <br />the approved total project cost initially or after negotiations with the contractor the cost <br />is not reduced to an amount within the total project cost, the Provider is not obligated to <br />engage in further redesign. <br /> <br />3. Basic Services <br /> <br />a. Basic Services. The services to be rendered pursuant to this Agreement are as follows (fully <br />describe services or products to be provided): Print 30,000 copies of the 2022-23 Visitor's <br />Guide, 6x10 with map insert, 56 pages plus 4 including map, 80lb gloss cover and 60lb gloss <br />Text FCS certified 30% post-consumer waste (recycled), 4-color throughout, bleeds on all <br />sides. All brochures will be saddle-wired and shrunk wrapped in bundles of 25 with 2 bundles <br />per box. Printer is to provide high resolution four-color proofs to client for approval, InDesign <br />files with linked photos will be submmitted as digital files no later than 7/29/2022 by Sallie <br />Scharding on behalf of Visitors Bureau. <br /> <br />4. Duration of Services <br /> <br />a. Term. The term of this Agreement shall be from 04/20/2022 to 9/2/2022. <br /> <br />b. Scheduling of Services. <br />i) The Provider shall schedule and perform its activities in a timely manner. <br /> <br />ii) Should the County determine that the Provider is behind schedule, it may require the <br />Provider to expedite and accelerate its efforts, including providing additional resources <br />and working overtime, as necessary, to perform the Basic Services in accordance with <br />the approved project schedule at no additional cost to the County. <br /> <br />iii) The Commencement Date for the Provider's Basic Services shall be 04/22/2022. <br /> <br />5. Compensation <br /> <br />a. Compensation for Basic Services. Compensation for Basic Services shall include all <br />compensation due the Provider from the County for all services satisfactorily (as determined <br />by the County) performed pursuant to this Agreement. The maximum amount payable for Basic <br />Services shall not exceed Thirty six thousand five hundred five and 50/100 Dollars <br />($36,505.50). Payment for satisfactorily performed Basic Services shall become due and <br />DocuSign Envelope ID: 4EA87A33-F0C1-4EFD-82C6-8DCCB638AF77