Orange County NC Website
Page 7 of 8 <br />mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or <br />pump is dedicated to multiple stations, an evaluation of all the pump stations’ storage capacities <br />and the rotation schedule of the portable power source or pump, include travel timeframes, shall <br />be provided. <br />c. Changes to the project that do not result in non-compliance with this permit, regulations, or the <br />Minimum Design Criteria should be clearly identified on the record drawings, on the certification <br />in the space provided, or in written summary form. <br />Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting <br />in non-compliance with this permit (including but not limited to pipe length changes of 10% or <br />greater, increased flow, pump station design capacity design increases of 5% or greater, and <br />increases in the number/type of connections), regulations, or the Minimum Design Criteria. <br />Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case-by- <br />case basis and each on its own merit. Please note that variances to the Minimum Design Criteria <br />should be requested and approved during the permitting process prior to construction. After- <br />construction requests are discouraged by the Division and may not be approved, thus requiring <br />replacement or repair prior to certification & activation. [15A NCAC 02T .0116] <br />8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division’s <br />Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until <br />corrected. If there is an unforeseen obstacle in the field where all viable solutions have been <br />examined, a slope variance can be requested from the Division with firm supporting documentation. <br />This shall be done through a permit modification with fee. Such variance requests will be evaluated <br />on a case-by-case basis. Resolution of such request shall be evident prior to completing and submitting <br />the construction certification. [ 15A NCAC 02T.0105(n)] <br />9. A copy of the individual permit and construction record drawings shall be maintained on file by the <br />Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] <br />10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 02T; the <br />Division’s Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division’s <br />Minimum Design Criteria for the Fast-Track Permitting of Pump Station and Force Mains adopted June <br />1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement <br />action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143- <br />215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of <br />the North Carolina-licensed Professional Engineer to the licensing board. [15A NCAC 02T .0108(b-c)] <br />11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the <br />creation of nuisance conditions, the Permittee shall take immediate corrective action, including those <br />as may be required by this Division, such as the construction of additional or replacement facilities. <br />15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] <br />12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, <br />rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local <br />government agencies which have jurisdiction or obtaining other permits which may be required by <br />the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] <br />DocuSign Envelope ID: 5B39D4BD-E0F1-4D92-A432-27FBE82D9C83