ORANGE COUNTY 019913-7
<br />
<br />Emergency Management Warehouse Building Dehumidification General Requirements for
<br /> Divisions 23 and 26 Work
<br />
<br />
<br />Contractor shall submit for review any samples required by the technical specification sections or that may be 1
<br />requested by the A-E. 2
<br /> 3
<br />With each electrical testing and compliance submittal, Contractor shall submit evidence of compliance that each 4
<br />manufactured item or component of electrically-operated equipment and that each fabricated assembly of electrically 5
<br />operated equipment furnished complies with the testing requirements. 6
<br /> 7
<br /> 8
<br />USE OF BRAND NAMES 9
<br /> 10
<br />Brand names, where scheduled as “basis of design,” are to be considered for information purposes and are not 11
<br />intended to be a product specification. 12
<br /> 13
<br />Where the Contractor proposes to use an item of equipment other than that indicated as basis of design that 14
<br />may require redesign of the structure, partitions, foundations, piping, wiring, or any other part of the 15
<br />mechanical, electrical, or architectural layout, all such redesign and all new drawings and detailing required 16
<br />shall be prepared by the Contractor at his own expense and submitted for review by the A-E. 17
<br /> 18
<br />Where such deviation requires a different quantity and arrangement of ductwork, piping, wiring, raceway, or 19
<br />equipment from that specified or indicated on the Drawings, the Contractor shall furnish and install any such 20
<br />ductwork, piping, structural supports, insulation, controllers, motors, starters, electrical wiring and raceway, 21
<br />and any other additional equipment required by the system, at no additional cost. 22
<br /> 23
<br />Brand names, where used as a product specification, are intended to denote the standard of quality required for the 24
<br />particular material or product. 25
<br /> 26
<br />Where the term “equal” or “equivalent” is present, such specification does not restrict the Contractor to a 27
<br />specific brand and equivalent products by other manufacturers may be acceptable. The term "equal" or 28
<br />"equivalent" shall be interpreted to mean a material or product that is similar and equal in type, quality, size, 29
<br />capacity, composition, finish, color, and other performance characteristics to the material or product 30
<br />specified by brand name, and that, in the opinion of the A-E, is suitable for the same use and capable of 31
<br />performing the same function as the material or product specified. Proposed equivalent items must be 32
<br />reviewed by the A-E before they are purchased or incorporated into the work. 33
<br /> 34
<br /> 35
<br />EQUIPMENT SUBSTITUTIONS AND CHANGES/EXTRA COSTS FOR CHANGES IN BUILDING SERVICES 36
<br /> 37
<br />Where the Contractor proposes to use an item of equipment other than that specified or detailed on the Drawings, 38
<br />requiring any redesign of the structure, partitions, foundations, piping, wiring, or any other part of the mechanical, 39
<br />electrical, or architectural layout, all such redesign and all new drawings and detailing required shall be prepared by 40
<br />the Contractor at his own expense and submitted for review by the A-E. 41
<br /> 42
<br />Where such approved deviation requires a different quantity and arrangement of ductwork, piping, wiring, raceway, or 43
<br />equipment from that specified or indicated on the Drawings, the Contractor shall furnish and install any such 44
<br />ductwork, piping, structural supports, insulation, controllers, motors, starters, electrical wiring and raceway, and any 45
<br />other additional equipment required by the system, at no additional cost. 46
<br /> 47
<br />It is the responsibility of the Contractor to notify the A-E in all cases where the requirements of proposed equipment 48
<br />differ from the requirements specified, shown, or implied on the Drawings or within the Specifications. Failure of the 49
<br />Contractor to notify the A-E shall not relieve the Contractor of the responsibility of providing compatible 50
<br />equipment at no additional cost as described above. 51
<br /> 52
<br /> 53
<br />OPERATION AND MAINTENANCE DATA 54
<br /> 55
<br />For each Division of the Work, provide four (4) copies of Operating Manuals, Maintenance Manuals, and Test 56
<br />Reports, bound in suitable covers, to the A-E at least two (2) weeks prior to the final inspection of the project. 57
<br /> 58
<br />Each manual shall include a cover sheet listing the following: 59
<br />DocuSign Envelope ID: 7668B866-6C26-485C-9A45-DAAB5D4BD951
|