Browse
Search
2022-133-E-AMS-Warren Hay Mechanical Contractors-Emergency Services Warehouse Dehumidification
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-133-E-AMS-Warren Hay Mechanical Contractors-Emergency Services Warehouse Dehumidification
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2022 1:08:32 PM
Creation date
4/6/2022 1:04:33 PM
Metadata
Fields
Template:
Contract
Date
4/6/2022
Contract Starting Date
4/6/2022
Contract Ending Date
4/6/2022
Contract Document Type
Contract
Amount
$185,662.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY 015000-1 <br /> <br />Emergency Management Warehouse Building Dehumidification Temporary Facilities and Controls <br /> <br /> <br />SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS 1 <br /> 2 <br />PART 1 - GENERAL 3 <br /> 4 <br /> 5 <br />RELATED DOCUMENTS 6 <br /> 7 <br />Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Divi-8 <br />sion 01 Specification sections, apply to this section. 9 <br /> 10 <br />SUMMARY 11 <br /> 12 <br />This Section includes requirements for temporary utilities, support facilities, and security and protection facilities. 13 <br /> 14 <br /> 15 <br />SUBMITTALS 16 <br /> 17 <br />Site Plan: Show proposed temporary facilities, utility hookups, staging areas, and parking areas for construction per-18 <br />sonnel. 19 <br /> 20 <br />Fire Protection Plan: Show compliance with requirements of NFPA 241 and authorities having jurisdiction. Indicate 21 <br />Contractor personnel responsible for management of fire-prevention program. 22 <br /> 23 <br />Moisture and Mold Protection Plan: Describe procedures and controls for protecting materials and construction from 24 <br />water absorption and damage. 25 <br /> 26 <br />Describe delivery, handling, and storage provisions for materials subject to water absorption or water dam-27 <br />age. 28 <br /> 29 <br />Indicate procedures for discarding water-damaged materials, protocols for mitigating water intrusion into 30 <br />completed Work, and replacing water-damaged Work. 31 <br /> 32 <br />Dust and Contamination Control Plan: Submit coordination drawing and narrative that indicates the dust control 33 <br />measures proposed for use, proposed locations, and proposed time frame for their operation. 34 <br /> 35 <br />Project Identification Sign: Submit details of Project identification sign, including construction and installation. 36 <br /> 37 <br /> 38 <br />PART 2 - PRODUCTS 39 <br /> 40 <br /> 41 <br />MATERIALS 42 <br /> 43 <br /> 44 <br />Polyethylene Sheet for Dust Control: Reinforced, fire-resistive sheet, 6-mil minimum thickness, with flame-spread 45 <br />rating of 15 or less per ASTM E 84 and passing NFPA 701 Test Method 2. 46 <br /> 47 <br /> 48 <br />TEMPORARY STORAGE AND FABRICATION UNITS 49 <br /> 50 <br />Provide sheds, storage containers, etc. sized, furnished, and equipped to accommodate materials and equipment for 51 <br />construction operations. Store combustible materials apart from building. 52 <br /> 53 <br /> 54 <br />PART 3 - EXECUTION 55 <br /> 56 <br /> 57 <br />GENERAL 58 <br /> 59 <br />Comply with NFPA 241, Standard for Safeguarding Construction, Alterations, and Demolition Operations and ANSI 60 <br />A10 Series standards for Safety Requirements for Construction and Demolition. 61 <br />DocuSign Envelope ID: 7668B866-6C26-485C-9A45-DAAB5D4BD951
The URL can be used to link to this page
Your browser does not support the video tag.