Browse
Search
2022-133-E-AMS-Warren Hay Mechanical Contractors-Emergency Services Warehouse Dehumidification
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-133-E-AMS-Warren Hay Mechanical Contractors-Emergency Services Warehouse Dehumidification
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2022 1:08:32 PM
Creation date
4/6/2022 1:04:33 PM
Metadata
Fields
Template:
Contract
Date
4/6/2022
Contract Starting Date
4/6/2022
Contract Ending Date
4/6/2022
Contract Document Type
Contract
Amount
$185,662.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY 011100 - 1 <br /> <br />Emergency Management Warehouse Building Dehumidification Summary of the Work <br /> <br /> <br />SECTION 011100 - SUMMARY OF THE WORK 1 <br /> 2 <br /> 3 <br />RELATED DOCUMENTS 4 <br /> 5 <br />Drawings and general provisions of the Contract, including General and Supplementary Conditions and other 6 <br />Division 01 Specification sections, apply to this section. 7 <br /> 8 <br /> 9 <br />WORK COVERED BY CONTRACT DOCUMENTS 10 <br /> 11 <br />The Work of the Project is defined by the Contract Documents and generally consists of the following: 12 <br /> 13 <br />Install new dehumidification units, install new HVLS fans, improve existing ventilation system and provide 14 <br />new monitoring system. 15 <br /> 16 <br /> 17 <br />ACCESS TO SITE 18 <br /> 19 <br />Contractor will be provided with card access to the space and be responsible for securing the construction 20 <br />site. The contractor shall be allowed a maximum of 10 parking spots in the gravel lot behind the building. 21 <br /> 22 <br /> 23 <br /> 24 <br />WORK RESTRICTIONS 25 <br /> 26 <br />General Work Restrictions: Comply with limitations on use of public streets and with other requirements of authorities 27 <br />having jurisdiction. 28 <br /> 29 <br />Owner' work rules and/or restrictions on construction operations, as appended at the end of this Section, must be 30 <br />adhered to by all Contractor personnel. 31 <br /> 32 <br />Controlled Substances: Use of tobacco products and other controlled substances on Project site is not permitted. 33 <br /> 34 <br />Employee Identification: Provide identification tags for Contractor personnel working on Project site. Require 35 <br />personnel to use identification tags at all times. 36 <br /> 37 <br /> 38 <br />PART 2 - PRODUCTS (Not Used) 39 <br /> 40 <br /> 41 <br />PART 3 - EXECUTION (Not Used) 42 <br /> 43 <br /> 44 <br />END OF SECTION 011000 45 <br />DocuSign Envelope ID: 7668B866-6C26-485C-9A45-DAAB5D4BD951
The URL can be used to link to this page
Your browser does not support the video tag.