11 <br /> Slide #7 <br /> The 203 Project - Budget Evolution <br /> Design work finished in November 2021 <br /> t Bidding for the GIMP started on January 17111, 2022 <br /> and finished on February 1 t", 2022. <br /> i The tabulation of all of the bird packages age has <br /> produced a tentative Guaranteed Maximum Price <br /> for construction of 4, 2,0 7. <br /> * Total Project Cost jumped from $31 ,034,982 to <br /> 41 , 174, 40. The County Share increased by $5.4 <br /> million. _ <br /> ORANGE COUNTY <br /> rrOORr<<cLa ROLINA <br /> Slide #8 <br /> The 203 Project - Budget Evolution <br /> Total <br /> Orional Total 15u(Jge# $38,S95,S95,40 <br /> Revised rasa1 8Odrt(march 2621) 8�0049� ,DO <br /> rotaI Bud get with Project GMP[tentative) $4tI?4,S40LU0 <br /> 243 Protect Rudge: <br /> St"i3OO0 mac <br /> S�i?WP w <br /> 536%OW,0)1).00 <br /> s2sKDIO.G} W <br /> SWAW'D06.oa <br /> 573,AUOJ=W <br /> S3AaoaJao.o3 <br /> 56.00Q.4*7.Ov <br /> 5&03 or R,vl To.a&ap-. RPds&d Toul 9.Vt roW 9udWwhh <br /> SMarh26237 PmIm GMP 1Nnrrlwe� ORANGE <br /> }� �1/ <br /> ODUNT <br /> rrOO>xr<<cn RJDLINA <br />