Orange County NC Website
10 <br /> Slide #5 <br /> The 203 Project — Budget Evolution <br /> Total <br /> Original Project Budget $28,195,195,00 <br /> Revised Budget (March 2021) $31,034,982,00 <br /> 203 Project S udget <br /> sh,aaaM.W <br /> 53o,su�,ow.oa <br /> 53o-A�A�� <br /> Sxe,saoA�.� <br /> 524p00AlGAp <br /> $26544,49GA4 <br /> S2B".Oww <br /> 527,SOpMA0 <br /> $27XWrooa.a3 <br /> Oriww HOW audw Ramad 9udpoteMarrh2021) ORANGE <br /> rrOORrI<cLa RC}Lli*]A <br /> Slide #6 <br /> The 203 Project Budget Evolution <br /> • Design Development <br /> DD) completed in May <br /> 2021 . <br /> • DD construction <br /> estimate over budget. <br /> * VE efforts able to bring <br /> the project back within <br /> revised construction <br /> budget. -- <br /> 20,3__ ORANGE COUNTY <br /> N{}RTI I CAROLINA <br /> Steve Arndt said that the design phase finalizes schematic design and adds more detail. <br />