Browse
Search
Agenda - 12-09-2003-8m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 12-09-2003
>
Agenda - 12-09-2003-8m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:21:36 PM
Creation date
8/29/2008 10:36:55 AM
Metadata
Fields
Template:
BOCC
Date
12/9/2003
Document Type
Agenda
Agenda Item
8m
Document Relationships
2003 NS Housing - Section 8 Project Based Voucher Program
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20031209
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~. C~ <br />to satisfy any liability of the Owner or other contractor for liquidated damages pursuant to <br />Section Z.4, The amounts withheld may be disbursed by HUD for and on account of the Owner or <br />other contractor to the respective employees to whom they are due, and to the Federal Govern- <br />ment in satisfaction of liquidated damages under Section 2 4. <br />2.9 RESERVED. <br />2.10 EVIDENCE OF UNIT(S) COMPLET[ON; ESCROW, <br />(a) The Owner shall evidence the completion of the unit(s) by famishing the PHA in addi- <br />tion to the requirements listed in Section 1.6 of this Agreement, a certification of compli- <br />ance with the provisions of Sections 2.4 and 2.8 of this Agreement, and that to the best of <br />the Owner's knowledge and belief there are no claims of underpayment to laborers or <br />mechanics in alleged violation of these provisions of the Agreement. In the event there <br />are any such pending claims to the know ledge of the Owner, the PHA, or HUD, the <br />Owner will place a sufficient amount in escrow, as directe d by the PHA or HUD, to <br />assure such payments. <br />(b) The escrows required under Sections 2.8 and 2.10 shall be paid to HUD, as escrowee, or <br />to an escrowee designated by HUD, and the conditions and manner of releasing such <br />escrows shall be designated and approved by HUD, <br />2.11 FLOOD INSURANCE. <br />If the project is located in an area that has been identified by the Federal Emergency Manage- <br />ment Agency as an area having special flood hazards and if the sale of flood insurance has been <br />made available under the National Flood Insurance Program, the Owner agrees that the project <br />will be covered, during its anticipated economic or useful life, by flood insurance in an amount at <br />least equal to its development or project cost (less estimate d land cost) or to the limit of coverage <br />made available with respect to the particular type of property under the National Flood Insurance <br />Act of 1968, whichever is less. <br />Page 16 of i6 HUD-52531-B (12/88) <br />ref Handbook 7420.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.