Browse
Search
Agenda - 12-09-2003-8m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 12-09-2003
>
Agenda - 12-09-2003-8m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:21:36 PM
Creation date
8/29/2008 10:36:55 AM
Metadata
Fields
Template:
BOCC
Date
12/9/2003
Document Type
Agenda
Agenda Item
8m
Document Relationships
2003 NS Housing - Section 8 Project Based Voucher Program
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20031209
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Notification of Completion. The Owner agrees to notify the PHA when the work is <br />completed and 4o submit to the PHA the items described in paragraph C of this section. <br />C. Evidence of Completion. When the work is completed, the Owner must provide the <br />PHA with the following: <br />A certificate of occupancy and other official approvals as required by the local- <br />ity. <br />2. A certification by the Owner that: <br />(a) The work has been completed in accordance with the requirements of <br />this Agreement; <br />(b) There are no defects or deficiencies in the work except for items of <br />delayed completion which are minor or which are incomplete because of <br />weather conditions and, in any case, do not preclude or affect occupancy, <br />(c) The unit(s) has been rehabilitated or constructed and is in accordance <br />with applicable zoning, building, housing and other codes, ordinances or <br />regulations, as modified by any waiver obtained from appropriate <br />officials; <br />(d) Any unit built prior to 1978 is in compliance with applicable HUD Lead <br />Based Paint regulations; and <br />(e) If'L,abor Standards Requirements are applicable, the Owner has com- <br />plied with the requirements of Section 2.10 of this Agreement. <br />3. For projects where construction inspections by HUD staff are not required by <br />HUD, a certification from the inspecting architecC stating that the units have been <br />constmcted in accordance with the certified working drawings and specifica- <br />tions, Housing Quality Standards, local codes and ordinances, and zoning <br />requirements. <br />D Review and Inspection. <br />ARer receipt of the evidence of completion, the PFIA agrees to review the <br />evidence of completion for compliance with paragraph C of this section and, if <br />applicable, Section 2,10. <br />Page 7 of 75 form HUD-52537-A (4/90) <br />ref. Handbook 7420.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.