Browse
Search
2022-132-E-Planning-ECS Southeast-contract amendment 1_additional services for construction materials testing CMT for the Lake Orange erosion control barrier replacement project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-132-E-Planning-ECS Southeast-contract amendment 1_additional services for construction materials testing CMT for the Lake Orange erosion control barrier replacement project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 9:18:22 AM
Creation date
4/4/2022 9:17:35 AM
Metadata
Fields
Template:
Contract
Date
3/31/2022
Contract Starting Date
3/31/2022
Contract Ending Date
4/1/2022
Contract Document Type
Contract
Amount
$9,700.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:24ABA258-E523-44F8-BE50-C8F19D41AACC <br /> C2022 ECS SOUTHEAST,LLP FEE SCHEDULE <br /> Personnel <br /> Senior Principal Engineer............................................................................................................................$210.00/hour <br /> PrincipalEngineer.......................................................................................................................................$190.00/hour <br /> Senior Professional Engineer......................................................................................................................$145.00/hour <br /> ProjectManager.........................................................................................................................................$120.00/hour <br /> Assistant Project Manager..........................................................................................................................$90.00/hour <br /> Field Technician(**)...................................................................................................................................$52.00/hour <br /> ICCTechnician(**)......................................................................................................................................$70.00/hour <br /> NCDOT Field Technician (**)......................................................................................................................$70.00/hour <br /> Senior Level AWS CWI (NDE: UT, MT, PT, RI)(**)......................................................................................$100.00/hour <br /> Secretary.....................................................................................................................................................$55.00/hour <br /> Transportation via company or private vehicle..........................................................................................$ 0.75/mile <br /> Note: Charges for engineering and technical personnel will be made for time spent in the field, in engineering <br /> analysis, in preparation of reports, and in travel portal to portal from our office. For scheduling requests <br /> received without sufficient notice as stated within the ECS proposal, services will be staffed with <br /> available personnel at the associated unit rates. <br /> (**)=Overtime=Standard Rate x 1.50 for over 8 hours per day and outside normal business hours of <br /> 7:OOam to S:OOpm, holiday,Saturday,or Sunday <br /> EQUIPMENT and LABORATORY <br /> R-Meter .........................................................................................................................................................$50.00/day <br /> Coremachine.................................................................................................................................................$250.00/day <br /> GPREquipment..............................................................................................................................................$175.00/day <br /> Moisture Emission Test Kit............................................................................................................................$50.00/unit <br /> Nuclear Density and Moisture Measuring Equipment..................................................................................$50.00/day <br /> Thin Lift Nuclear Gauge.................................................................................................................................$50.00/day <br /> UltrasonicEquipment....................................................................................................................................$100.00/day <br /> Dipstick .........................................................................................................................................................$150.00/day <br /> Asphalt Bulk Specific Gravity.........................................................................................................................$75.00 each <br /> WindsorProbe Gun.......................................................................................................................................$125.00/day <br /> WindsorProbe Shots.....................................................................................................................................$75.00/shot <br /> Standard Proctor(ASTM D-698)....................................................................................................................$150.00 each <br /> Modified Proctor(ASTM D-1557)4 inch mold..............................................................................................$175.00 each <br /> Atterberg Limits Testing................................................................................................................................$70.00 each <br /> Wash200 Sieve Analysis................................................................................................................................$55.00 each <br /> MoistureContent..........................................................................................................................................$12.00 each <br /> Testing of Cylinders, Prisms,Cubes and Core Specimens: <br /> Compressive Strength of grout prisms(3.5"0.5"0") ......................................................................$20.00 each <br /> Compressive strength of mortar cubes..........................................................................................$14.00 each <br /> Compressive strength of concrete cylinders including reserves, (ASTM C-39).............................$14.00 each <br /> Core Specimen (including sample preparation).............................................................................$30.00/test <br /> Extra Molds-cylinder molds included in compressive strength rate(per case of 30) $65.00/case <br /> Note:The above charges will be made for tests and equipment operated by ECS SOUTHEAST, LLP personnel in addition <br /> to personnel charges already listed.Soil Samples requiring a turnaround time of less than 5 days will be billed <br /> at 1.5 times the test unit rate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.