Orange County NC Website
89 <br /> Page 3 of 5 Issue Date: November 8,2017 Case No.: 704-651211 CLOMR-APP <br /> Federal Emergency Management Agency <br /> Washington, D.C. 20472 <br /> CONDITIONAL LETTER OF MAP REVISION <br /> COMMENT DOCUMENT (CONTINUED) <br /> COMMUNITY INFORMATION (CONTINUED) <br /> DATA REQUIRED FOR FOLLOW-UP LOMR <br /> Upon completion of the project,your community must submit the data listed below and request that we make a final determination on <br /> revising the effective FIRM and FIS report. If the project is built as proposed and the data below are received, a revision to the FIRM <br /> and FIS report would be warranted. <br /> •Form 1,entitled"Overview&Concurrence Form." Detailed application and certification forms must be used for requesting final <br /> revisions to the maps. Therefore,when the map revision request for the area covered by this letter is submitted, Form I must be included. <br /> If as-built conditions differ from the proposed plans, please submit new forms,which may be accessed at https://www.fema.gov/mt-2- <br /> application-forms-and-instructions,or annotated copies of the previously submitted forms showing the revised information. <br /> •Form 2,entitled"Riverine Hydrology and Hydraulics Form."Hydraulic analyses for as-built conditions of the base flood and the non- <br /> encroachment stations, must be submitted with Form 2. <br /> • Form 3, entitled"Riverine Structures Form." <br /> •Hydraulic analyses, for as-built conditions,of the base flood;the 10-percent,2-percent, and 0.2 percent annual chance floods; and the <br /> regulatory floodway,together with a topographic work map showing the revised floodplain and floodway boundaries. Please ensure that <br /> the revised information ties in with the current effective information at the downstream and upstream ends of the revised reach. <br /> •An annotated copy of the FIRM,at the scale of the effective FIRM,that shows the revised floodplain and floodway boundary <br /> delineations shown on the submitted work map and how they tie into the floodplain and floodway boundary delineations shown on the <br /> current effective FIRM at the downstream and upstream ends of the revised reach <br /> •As-built plans, certified by a registered professional engineer,of all proposed project elements <br /> •A copy of the public notice distributed by your community,stating its intent to revise the regulatory floodway,or a signed statement by <br /> your community that it has notified all affected property owners and affected adjacent jurisdictions <br /> • Documentation of the notification to property owners who will be affected by any widening/shifting of the base floodplain and/or any <br /> BFE increases along West Price Creek. <br /> This comment is based on the flood data presently available. If you have any questions about this document,please contact the FEMA Map Information eXchange(FMIX)toll <br /> free at 1-677-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue,Suite 500,Alexandria,VA 22304-6426. Additional <br /> Information about the NFIP is available on the FEMA website at https:llwww.fema.govinational-flood-insurance-program. <br /> Petrick'Rick"F.Sacbibit,?.E.,Branch Chief <br /> Engineering Services Branch <br /> Federal Insurance and Mitigation Administration 17-04-65128 104 <br />