Browse
Search
Agenda 04-05-22; 8-g - Major Subdivision Preliminary Plat Revision – The Lodges at Chapel Hill
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 04-05-2022 Business Meeting
>
Agenda 04-05-22; 8-g - Major Subdivision Preliminary Plat Revision – The Lodges at Chapel Hill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:14:08 PM
Creation date
3/31/2022 3:18:40 PM
Metadata
Fields
Template:
BOCC
Date
4/5/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Minutes 04-05-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
RES-2022-017-Resolution of the Orange County Board Of County Commissioners
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
65 <br /> NOTES <br /> -GARX. 1 SEE C-101 FOR ALL GENERAL NGTES, <br /> PiI.TRBD-C <br /> RO.— <br /> =T111ME'l=E NPEO <br /> --BL •AXY10111"1 <br /> LA' <br /> =121"TTIVOE'111MV Tl— -1- <br /> -11-T D.DINH ErvD CPP <br /> STO T1— <br /> sEPs <br /> T -1 IG" I <br /> r DPAW C_TE= <br /> DEVICE 'ITPCDL IN TND <br /> TC <br /> -— ------------ <br /> TEMPpvARY <br /> - 11E <br /> L,/.-PA., FECDMMExDED <br /> PRY POND A:LOWER BASIN OUTLET STRUCTURE <br /> NXF T-DDwx DRmcE T. <br /> Y POND A:TYPICAL SECTION <br /> D-108 NTS <br /> O <br /> VEGETATIVE SI E SLOPES. PLANT WITH gUFEER <br /> NON-CLUMPING.11 GRAGII TREESRIPARIAN <br /> AND WOODY SHRUBS NOT ALLOWED. <br /> 'O'C, 75 WIDE EMERGENCY SP- REVISIOIS <br /> ',,,AGGE ELEV.391 DATE DESCR PTION <br /> 'C'GIN G'/l3/20 PER ORANGE c0.G8/11/21 RELOCATED DRY POND A <br /> 3 10/1/21 PER ORANGE CO, <br /> PROJECT MANAGER: PROJECT ENGINEER: <br /> GSM <br /> DRAWN BY: 1111ED BY: <br /> ,10'DWIDE RIP PAP IT'MAINTFNA..II 1G./TAP DATE. CO. <br /> NE INLET DITCH EASEMENT MARCH 26,2019 <br /> Q <br /> OUTLET 311 <br /> IIII III I (SEE GETAIL 2.D-106) <br /> MacCONNELL <br /> --- ------- ------------- <br /> &Associates,P.C. <br /> I CASCADE P01=NE,SBITE'111 <br /> Jil 'APY NORTH 751 <br /> o ---- AS -------- <br /> ------- P.O.BOX <br /> ------------------- ----------------------------__=____------- I <br /> PtIVILDE I-ILIN.1 11Sl. <br /> GjN IS <br /> BROYHILL WILES <br /> 15'POP MIN.2S S.11 <br /> — F– — — — — — — — <br /> — — — — THE LODGES AT <br /> CHAPEL HILL <br /> uL THRE ORANGE COUNTY,NC <br /> 2380 € <br /> 5 DETAILS 6 <br /> DRY POND A:PLAN VIEW PROJECT NUMBER DRAwwc NUMBER e <br /> A55602.00 <br /> 2. 0 D-1 6 <br /> 556 <br />
The URL can be used to link to this page
Your browser does not support the video tag.