Browse
Search
Agenda 04-05-22; 8-g - Major Subdivision Preliminary Plat Revision – The Lodges at Chapel Hill
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 04-05-2022 Business Meeting
>
Agenda 04-05-22; 8-g - Major Subdivision Preliminary Plat Revision – The Lodges at Chapel Hill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:14:08 PM
Creation date
3/31/2022 3:18:40 PM
Metadata
Fields
Template:
BOCC
Date
4/5/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Minutes 04-05-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
RES-2022-017-Resolution of the Orange County Board Of County Commissioners
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
58 <br /> NOTES <br /> 394 PROPOSED GUARDRAILS 1. SIDE SLOPE SEEDINGMIXTURES WILL BE 4 <br /> NOT TO SCALE DESIGNED FOR STEEP SLOPES WILL <br /> THAN <br /> 3:1)WITH LOW MAINTENANCE, <br /> SIDE SLOPES LESS THENWILL BE <br /> REINFORCED WITH TURF REINFORCEMENT <br /> 3 1 wI REINFORGEMENT <br /> - - 38 380 MATS <br /> PROPOSE.GUAR.AILS FROM <br /> p 20 69 8p' 500-YR WSE=366.60-FT 0 11+8A01 <br /> STATION 6+68.16 <br /> SCALE 1'=6p' <br /> 37 370 <br /> 100 YR WEE=366.20-FT PROPOSED GRADE <br /> EDGE OF PAVEMENT <br /> 36 � 360 <br /> IE% GROUND <br /> EDGE OF SHOULDER <br /> PROPOSED 3"ALUMINUM <br /> O CVEa1 TBURIED t' <br /> s N <br /> APPROXIMATELY U.40 ACRES <br /> OF—HE DISTURBED <br /> 350- <br /> 8+00 J00 10+00 11+00 12+00 13+000 <br /> 4 <br /> PROPOSED GUARDRAILS FROM <br /> m STATION t6+60.17 TO tit+86.01 <br /> StOIIOM <br /> PROFILE VIEW <br /> REVISIONS <br /> NO. DAIS PRIORIPIION <br /> D2/13/2B PER ORANGE CO. <br /> 2 08/31/21 RELOCATED <br /> PR POSED GUARDRAILS 3 10/1/21 PER GRANGE CC.PON <br /> &WINGWALLS NOT TO <br /> SCALE PROJECT MANAGER: PROJECT ENGINEER <br /> A <br /> CULVERT CROSS SECTION GSM TAP <br /> PROPOSED T3'-0"%fi'- BC �% <br /> DRAWN BY: CHECKED BT: <br /> ZONE 1 TOTAL IMPACTS: ti� JOH/TAP GSM <br /> ZONE 2 TOTAL IMPACTS: IMPACTS <br /> SF Ev .ATE; <br /> 5,009 SF <br /> MARCH 26.2019 <br /> M RIP RAP ♦K fARPi4 <br /> R OF _ <br /> YA 'i <br /> 380 5' 18 23/AM <br /> I 60' R/wI ITA ..... <br /> FROM ELEVATION=1369.6• _ MaCCONNELL <br /> I PROPOSED GUARDRAIL - P_Associates,P.C. <br /> 03 <br /> sl 370' r/FT 3'/FT I'/FT r/F CRRWeVILLE' aouNAs7esa <br /> _ WINGWALL, <br /> 1.5: eL:lev91 A01nps A%:TINN111-0 <br /> HEA-1BROYHILL WILES <br /> CULVERT BURIED 1 f00 <br /> ITHE LODGES AT <br /> 360 WEST PRICE GREEK <br /> CHAPEL HILL <br /> d I CL GROUND ELEVATION=2359,0' <br /> 8 <br /> SLOPE <br /> =lox EXISTIrvc cRourvO `a <br /> ^�`�� ORANGE COUNTY,NC D <br /> s <br /> s <br /> I350' STREAM CROSSING g <br /> PLAN VIEW —30' —20' —10' 0 10' 20' 30' PLAN AND PROFILE o <br /> PROJECT NUMBER DRAWING NUMBER g <br /> A55602.00 C-112 s <br />
The URL can be used to link to this page
Your browser does not support the video tag.