Browse
Search
Agenda 04-05-22; 8-g - Major Subdivision Preliminary Plat Revision – The Lodges at Chapel Hill
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 04-05-2022 Business Meeting
>
Agenda 04-05-22; 8-g - Major Subdivision Preliminary Plat Revision – The Lodges at Chapel Hill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:14:08 PM
Creation date
3/31/2022 3:18:40 PM
Metadata
Fields
Template:
BOCC
Date
4/5/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Minutes 04-05-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
RES-2022-017-Resolution of the Orange County Board Of County Commissioners
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
108 <br /> Conditions of Approval <br /> Revised 8/06/14 <br /> Several conditions specific to this project must be met as conditions of approval for the erosion <br /> control plan,before any work may begin. These are discussed below. <br /> 1. LAND-DISTURBING PERMIT: A Land-disturbing Permit must be purchased before <br /> any work begins. Failure to do so will subject you to enforcement actions that may <br /> include civil penalties of up to $5,000.00 per day, beginning on the date of detection and <br /> continuing until the violations are corrected. It is your responsibility to ensure that the <br /> Permit is purchased. In addition to the Permit fee, if applicable, the stormwater fee and <br /> plan review fee must be paid in full. The remaining fees to be paid for this project total <br /> $5,988.42. <br /> 2. BEFORE any land-disturbing activity can begin you must acknowledge in writing that <br /> you have read this letter, understand its requirements and implications, and are <br /> prepared to ensure that you, your contractors, agents, etc. will observe these <br /> requirements. A letter of acknowledgment is included. <br /> 3. This approval is based upon plan dated 2/18/2020, which indicates a maximum <br /> disturbed area of 10.02 Acres. <br /> 4. Contact Steve Kaltenbach at (919) 245-2588 to schedule the pre-construction conference. <br /> Typical attendees are the Owner and/or Representatives, Erosion Control Design <br /> Engineer,General Contractor and Grading Contractor. <br /> We look forward to working with you toward the successful completion of this project. If you <br /> have questions about this letter or project, do not hesitate to contact Erosion Control personnel <br /> at the telephone number in the letterhead. <br /> Failure to appeal these conditions in writing within 15 days after receipt of this letter, or <br /> initiation of land-disturbing activity, signifies your acceptance of these conditions of approval of <br /> the erosion control plan and your intention to observe and implement the conditions. <br /> S:\5_Erosion Control and Water Quality\Erosion Control and Water Quality\Jobs by year\New Work <br /> 18\Orange\The Lodges at Chapel Hill\The Lodges at Chapel Hill COA.docx 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.