105 <br /> Conditions of Approval <br /> Revised 8/06/14 <br /> • COORDINATION BETWEEN CONTRACTORS AND SUBCONTRACTORS: You <br /> must ensure that sediment and erosion control is coordinated during timbering, <br /> clearing, grading, and construction so that controls and devices are maintained and not <br /> removed or damaged. If this site is subject to NCG010000, you must adhere to all <br /> applicable requirements of that NPDES permit. More on NCGO10000 requirements are <br /> mentioned below. <br /> • KEEP A COPY OF THE APPROVED PLAN ON THE SITE: The plan must be available <br /> to the contractor and inspection personnel. Failure to do so is a violation. <br /> • DISPOSAL OF CLEARING AND DEMOLITION DEBRIS AND CONSTRUCTION <br /> WASTE: All debris and waste resulting from development of the site (stumps, brush, <br /> demolished structures, construction waste, etc.) must be properly disposed of in <br /> accordance with local and State regulations. Open burning of trees, limbs, stumps, and <br /> construction debris is prohibited. Concrete, stumps and other clearing debris and <br /> construction waste must be carried to appropriately permitted landfills. <br /> • SITE INSPECTIONS: The Ordinance authorizes Erosion Control personnel to enter the <br /> site for the purpose of investigation and inspection. Erosion Control personnel will <br /> periodically inspect the site to determine if the approved plan is being implemented and <br /> if it is successful. If problems or violations are found, the Erosion Control personnel will <br /> attempt to contact site personnel to discuss with them and arrange corrections within a <br /> specified time. Also, a written site inspection report will be left with site personnel, in <br /> the mailbox on-site, or transmitted in another manner. If you, or your contractor, have <br /> questions about the inspection report, contact the Erosion Control personnel <br /> immediately- do not wait until the deadline to start asking questions. <br /> • COMMUNICATIONS: In addition to leaving inspection reports on-site, a copy will be <br /> mailed and/or faxed to Broyhill Wiles Inc.. As the entity responsible for the land- <br /> disturbing activity, you should ensure compliance with the approved erosion control <br /> plan and see that your contractor corrects violations by the given deadline. Erosion <br /> Control personnel are generally in their offices and available by phone between 8:00 and <br /> 9:00 a.m. and 4:30 and 5:00 p.m., and have mobile phones as well. Feel free to contact <br /> them with any questions or concerns. <br /> • PERSONNEL, EQUIPMENT, AND MATERIALS MUST BE AVAILABLE FOR <br /> MAINTENANCE AND REPAIRS AT ALL TIMES: Maintenance is a critical element of <br /> the erosion control plan needed to ensure that devices continue to operate effectively. <br /> You must be prepared to work on the devices when the need arises. In order to do this, <br /> you may consider stockpiling certain materials such as stone, sediment fence and wire, <br /> etc. <br /> S:\5_Erosion Control and Water Quality\Erosion Control and Water Quality\Jobs by year\New Work <br /> 18\Orange\The Lodges at Chapel Hill\The Lodges at Chapel Hill COA.docx 6 <br />