Browse
Search
Agenda 04-05-22; 8-f - Request for Road Additions to the State Maintained Secondary Road System for Bridgeton Place and Forest Creek Road in the Creek Wood Subdivision
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2022
>
Agenda - 04-05-2022 Business Meeting
>
Agenda 04-05-22; 8-f - Request for Road Additions to the State Maintained Secondary Road System for Bridgeton Place and Forest Creek Road in the Creek Wood Subdivision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:11:18 PM
Creation date
3/31/2022 3:18:40 PM
Metadata
Fields
Template:
BOCC
Date
4/5/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-f
Document Relationships
Minutes 04-05-2022 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North Carolina Department of Transportation 11 <br /> Division of Highways <br /> Secondary Road Addition Investigation Report <br /> County: Orange Co. File No: 0-02-13 Date: 2/2/22 <br /> Township: Chapel Hill Div. File No: Div. No: 7 <br /> Local Bridgeton Place Creek Wood Subdivision <br /> Name: Subdivision Name: <br /> 0.10 mile 20' Surface SF9.5A Good <br /> Length: Width: Type: PVMT Condition: <br /> Surface 2" ABC Base 8" <br /> Thickness Base Type Thickness <br /> *Retaining <br /> *Bridges Yes No_✓_ * Pipe > 48" Yes No_JWalls Within_ Right of Way Yes No <br /> Y If Yes -Include Bridge Maintenance Investigation Report <br /> Is this a subdivision street subject to the construction requirements for such streets? Yes <br /> Recording Date: 9/24/99 Book: 84 Page: 64 <br /> Number of homes having entrances into road: 4 <br /> Other uses having entrances into road: <br /> If right-of-way is below the desired width, give reasons <br /> Right-of-Way Width: 60' under "Remarks and Recommendations." <br /> Is petition (SR-1) attached? Yes <br /> Is the County Commissioners Approval (SR-2) attached? Yes If not, why not? <br /> Is a map attached indicating information for reference in locating road by the <br /> Planning Department? Yes <br /> Cost to place in acceptable maintenance condition: Total Cost: $ <br /> Grade, drain, stabilize: $ Drainage: $ Other: $ <br /> Remarks and Recommendations: Meets Requirements. Recommend Addition <br /> Submitted by: Ltf____4C Reviewed and Approved: <br /> DISTRICT ENGINEER DIVISION ENGINEER <br /> Reviewed and Approved <br /> BOARD OF TRANSPORTATION MEMBER: <br /> Do not write in this space- For Use by Secondary <br /> Roads Unit <br /> Petition# <br /> Form SR-4 (11/05/07) <br />
The URL can be used to link to this page
Your browser does not support the video tag.