Browse
Search
Agenda 04-05-22; 8-g - Major Subdivision Preliminary Plat Revision – The Lodges at Chapel Hill
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2022
>
Agenda - 04-05-2022 Business Meeting
>
Agenda 04-05-22; 8-g - Major Subdivision Preliminary Plat Revision – The Lodges at Chapel Hill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 3:14:08 PM
Creation date
3/31/2022 2:59:14 PM
Metadata
Fields
Template:
BOCC
Date
4/5/2022
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for April 5, 2022 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2022\Agenda - 04-05-2022 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
77 <br /> Action ID Number: SAW-2007-00939 County: ORANGE <br /> Permittee: Mr. Kent Wiles <br /> Broyhill Wiles Building and Developing, Inc. <br /> Project Name: Damascus Church Road <br /> Date Verification Issued: April 6, 2018 <br /> Project Manager: Ms. Samantha Dailey <br /> Upon completion of the activity authorized by this permit and any mitigation required by the permit, <br /> sign this certification and return it to the following address: <br /> US ARMY CORPS OF ENGINEERS <br /> WILMINGTON DISTRICT <br /> Raleigh Regulatory Field Office <br /> Attn: Samantha Dailey <br /> 3331 Heritage Trade Drive, Suite 105 <br /> Wake Forest, North Carolina 27857 <br /> Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of <br /> Engineers representative. Failure to comply with any terms or conditions of this authorization may <br /> result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I <br /> administrative penalty, or initiating other appropriate legal action. <br /> I hereby certify that the work authorized by the above referenced permit has been completed in <br /> accordance with the terms and condition of the said permit, and required mitigation was completed in <br /> accordance with the permit conditions. <br /> Signature of Permittee Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.