Orange County NC Website
10 <br /> 1 Slide #5 <br /> The 203 Project — Budget Evolution <br /> Total <br /> Original Project Budgpt $28,195,195-OCA <br /> Revised Budget (March 2021) <br /> 203 Project Budget <br /> 511.5M=W <br /> 551,0W PW:W <br /> 57ik,�70,Ui6:tb <br /> S3CI',4HI�f}flOm <br /> 5�e,smn,�a.u� <br /> 529.QW.QW,W <br /> 52R,5(KIX QU,Q0 <br /> 5Z7 500M.W <br /> $27,767PW.a1 <br /> 526,".W,tMKl:Rq <br /> or"mlerrBudRo Rm�&ud eudptr MJrrt,1v471 yi z <br /> ORANGE COUNTY <br /> K4DRI-I I i:A 110 1-1 NA <br /> 2 <br /> 3 <br /> 4 Slide #6 <br /> The 203 Project — Budget Evolution <br /> . Design Development <br /> (DD) completed in May <br /> 2021 , y <br /> • DD construction <br /> estimate over budget. <br /> VE efforts able to bring �, <br /> L <br /> the project back withinrevised construction <br /> budget. ORANGE COUNTY <br /> (8 - <br /> h C 12 I"l 1 CAROLINA <br /> 5 <br /> 6 Steve Arndt said that the design phase finalizes schematic design and adds more detail. <br /> 7 <br /> 8 <br />