Orange County NC Website
6 <br /> 1 offices. The proposed site of the development at South Greensboro Street is located on an <br /> 2 existing Carrboro municipal parking lot near the center of the town. At that meeting, the Board <br /> 3 approved a construction budget of $11,777,000 for the Orange County portion of the project. <br /> 4 The total approved construction budget, including Carrboro's portion, was $22,282,000 <br /> 5 (Attachment 1). <br /> 6 <br /> 7 This project is being performed through a Construction Manager at Risk (CMAR) delivery <br /> 8 method. This delivery method entails a commitment by the Construction Manager (CM) to <br /> 9 deliver the project within a Guaranteed Maximum Price (GMP) which is based on the <br /> 10 construction documents and specifications at the time of the GMP plus any reasonably inferred <br /> 11 items or tasks. The project architect selected for the project is Perkins & Will and the <br /> 12 Construction Manager is the Barnhill Contracting Company. <br /> 13 <br /> 14 The design process began shortly after the approval of the project with the start of Schematic <br /> 15 Design (SD) development. At the completion of the Schematic Design phase in November <br /> 16 2020, a construction estimate derived from the design showed that the project was significantly <br /> 17 over budget. A Value Engineering (VE) effort immediately ensued and scope modifications <br /> 18 were made to bring the project costs down. After the completion of Value Engineering, the <br /> 19 project was still over budget, and at the March 2, 2021 BOCC Business meeting, the Board <br /> 20 approved additional funding through a combination of capital funding reallocation and a minor <br /> 21 scope reduction to close the budget gap of $1,807,160. Including the CMAR fee of $723,520, <br /> 22 Orange County's portion of the construction budget totaled $14,232,856. The total construction <br /> 23 budget, including Carrboro's portion, grew from $22,282,000 to $25,306,336. The cost overrun <br /> 24 was attributed the escalating costs associated with the parking deck. The Town of Carrboro did <br /> 25 not incur a cost overrun at that point in time. See the Chart#1, below for further detail: <br /> 26 <br /> 27 Chart#1 <br /> 203 Project <br /> Original Construction Budget Town Orange County Total <br /> Construction 10,505,000 11,777,000 $22,282,000.00 <br /> CMAR Fee 568,480 723,520 $1,292,000.00 <br /> Total Const 11,073,480 12,500,520 $23,574,000.00 <br /> BOCC Schematic Budget Adjustment $1,807,160 $1,807,160.00 <br /> 14,307,680 $25,381,160.00 <br /> Scope Adjustment(Part of BOCC Change) -74,824 -$74,824.00 <br /> 28 Revised Construction Budget(March 2021) $11,073,480 $14,232,856 $25,306,336.00 <br /> 29 <br /> 30 The project next proceeded into the Design Development (DD) phase of project design. Upon <br /> 31 completion of Design Development in May 2021, a new construction estimate was prepared, <br /> 32 and the project was once again found to be significantly over budget. Another round of Value <br /> 33 Engineering (VE) ensued, additional modifications were made, and the project cost was brought <br /> 34 down within budget. <br /> 35 <br /> 36 On February 4, 2022, a memorandum was sent to the BOCC and Carrboro Town Council <br /> 37 (Attachment 2) that provided a project bidding, approval, and financing schedule. Per the <br /> 38 schedule, thirty-two bid packages were released for bidding on January 17, 2022 with received <br /> 39 bids opened on February 9, 2022. Unfortunately, several bid packages could not be opened on <br /> 40 that date due to insufficient bidding by members of the construction community. <br /> 41 <br />