Browse
Search
2022-125-E-Planning-FSC-Fred Smith Company- Contract amdendment 1 to existing construction contract for the Lake Orange erosion control barrier replacement project-Addition of alternate 1
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-125-E-Planning-FSC-Fred Smith Company- Contract amdendment 1 to existing construction contract for the Lake Orange erosion control barrier replacement project-Addition of alternate 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2022 1:53:46 PM
Creation date
3/29/2022 1:53:42 PM
Metadata
Fields
Template:
Contract
Date
3/24/2022
Contract Starting Date
3/24/2022
Contract Ending Date
3/28/2022
Contract Document Type
Contract
Amount
$306,180.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 06/21 <br />NORTH CAROLINA <br />CONTRACT AMENDMENT #1 <br />ORANGE COUNTY <br /> <br /> <br />THIS CONTRACT AMENDMENT (“Amendment”) is made and entered into this 25th day of March, 2022 by and <br />between ORANGE COUNTY (hereinafter referred to as “County”) and FSC II, LLC (d.b.a. Fred Smith Company), <br />(hereinafter referred to as “Provider”). <br /> <br /> <br />WITNESSETH: <br /> <br />THAT WHEREAS, the County and Provider entered into a contract dated January 18, 2022, with an internal designation <br />of 2022-110 (hereinafter the “Original Agreement”), for the provision of services for Construction of the Lake Orange <br />Erosion Control Barrier Replacement Project (BASE BID SCOPE ONLY); and <br /> <br />WHEREAS, the County and Provider desire to amend the Original Agreement while keeping in effect all terms and <br />conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. <br /> <br />NOW THEREFORE, for and in consideration of the mutual covenants and agreements made herein, the parties agree to <br />amend the Original Agreement as follows: <br /> <br />1. The Scope of Work (Section 2, hereinafter called the “Work”) shall be expanded to include the <br />ALTERNATE-1 scoping as defined within the Construction Drawings and Written Specifications prepared <br />by the Designer, and as defined in the Lake Orange Erosion Control Barrier Replacement Bid Proposal from <br />the Provider dated December 8, 2021. <br /> <br />2. Section 3b is amended to complete substantially all Work included by July 15, 2022. <br /> <br />3. Section 5a is amended to reflect a maximum payable not-to-exceed amount of $744,180.00. <br /> <br />4. Except for the changes made herein, the Original Agreement shall remain in full force and effect to the extent <br />it is not inconsistent with this Amendment. In the event there is a conflict between the terms of the Original <br />Agreement and the terms of this Amendment, this Amendment shall control. <br /> <br /> <br /> IN TESTIMONY WHEREOF, this Amendment has been executed by the parties hereto, as of the date first above <br />written. <br /> <br />ORANGE COUNTY PROVIDER <br /> <br />______________________________ __________________________________ <br />Bonnie Hammersley Ty Johnson, Vice President – Contract Services <br />County Manager FSC II, LLC (d.b.a. Fred Smith Company) <br /> <br /> <br />DocuSign Envelope ID: 728B9CE0-812A-45E1-9198-7EEBE2CA7EF6
The URL can be used to link to this page
Your browser does not support the video tag.