Browse
Search
2022-120-E-Planning-Alpha and Omega Group-Contract Amendment 4 Lake Orange Dam Erosion Control (EC) Barrier Design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-120-E-Planning-Alpha and Omega Group-Contract Amendment 4 Lake Orange Dam Erosion Control (EC) Barrier Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 12:17:30 PM
Creation date
3/22/2022 12:17:27 PM
Metadata
Fields
Template:
Contract
Date
3/17/2022
Contract Starting Date
3/17/2022
Contract Ending Date
3/21/2022
Contract Document Type
Contract
Amount
$7,110.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 10, 2022 <br />Mr. Christopher J. Sandt, P.E. <br />Staff Engineer <br />Orange County Planning and Inspections Department <br />P.O. Box 8181 <br />131 W. Margaret Lane <br />Hillsborough, NC 27278 <br />Re: Proposal for Additional Construction Administration Services for Alternate 1 <br />RFQ 5285 Lake Orange Erosion Control Barrier Replacement <br />Amendment No. 4 <br />Dear Mr. Sandt: <br />Alpha & Omega Group is very pleased to offer professional engineering services for this project. <br />The details of our proposal are outlined in the following sections. <br />Project Understanding <br />Orange County desires to amend the current construction contract, awarded to the Fred Smith <br />Company, to include Alternate 1 as bid on December 8, 2021. <br />Alternate 1 includes the replacement of the existing erosion control barrier along the toe of the <br />earthen dam with Armorflex Concrete Block Mat for a width of 7’‐6” as depicted on the <br />contracted construction plans. <br />Scope of Services <br />The items included in our scope of service are as described by Task below: <br />Task 6a – Construction Engineering and Inspections (CEI)/Construction Materials Testing (CMT) <br />1.Schedule and Chair regular progress meetings (bi‐weekly) <br />2.Provide General Contract Administration as Orange County’s Representative <br />3.Provide Construction observation and reporting <br />4.Coordinate and oversee Construction Material Testing and reporting <br />5.Address Contractor’s RFI’s, Bulletin Drawings, Shop Drawings, and Product Submittals <br />6.Review Contractor’s Payment Applications <br />Attachment E - Additional Services (Task 6a)DocuSign Envelope ID: 8EA52929-F31A-48D7-BA7C-C1E0085BA334
The URL can be used to link to this page
Your browser does not support the video tag.