Browse
Search
2022-118-E-Planning-Timmons Group-Gravelly Hill Middle School stormwater wetland conversion
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-118-E-Planning-Timmons Group-Gravelly Hill Middle School stormwater wetland conversion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 12:15:35 PM
Creation date
3/22/2022 12:15:23 PM
Metadata
Fields
Template:
Contract
Date
3/17/2022
Contract Starting Date
3/17/2022
Contract Ending Date
3/22/2022
Contract Document Type
Contract
Amount
$24,565.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: <br />Date: March 11, 2022 <br />Client: Orange County, North Carolina <br />Project: Gravelly Hill Middle School Stormwater Wetland Conversion Total Total <br />PM SR PEIII PEII CT CL Total Fee Fee Orange County Tasks <br />Task # Task Fee <br />2 2 1 $655.00 <br />4 4 $800.00 <br />$3,200.00 <br />$650.00 1 Preliminary Design & Surveying $6,141.25 <br />1 2 $290.00 <br />1 4 4 $940.00 2 Hydrology & Concept Design $6,141.25 <br />1 8 14 $2,280.00 <br />2 4 12 $1,800.00 <br />1 2 8 12 32 $5,140.00 3 Final Design Package $6,141.25 <br />1 2 6 12 4 $2,540.00 <br />1 2 4 6 8 1 $2,195.00 4 Construction & Close-out $6,141.25 <br />Total $24,565.00 <br />5 10 41 66 44 2 <br />Construction and Close-out Phase <br />$2,400.00 <br />1 2 4 4 4 1 $1,675.00 <br />1 2 4 4 4 1 <br />Construction Contract Documents and Permitting <br />$24,565.00 <br />Billing <br />Rate <br />$180 <br />$140 <br />$110 <br />$90 <br />$85 <br />75 <br />CT - CAD Technician <br />CL - Clerical <br />Class <br />PM - Project Manager <br />SR - Senior Engineer <br />PE III - Project Engineer III <br />PE II - Project Engineer II <br />Project Total <br />Total Task 1b <br />Totals <br />Additional Service for Educational Component - Hourly <br />Totals <br />Informal Agency Coordination <br />Prepare Erosion Control and Permitting Submittals <br />Respond to Comments / Obtain Permits <br />Close-out Certifications and As-built Package to County <br />As-built Survey <br />Conceptual Design and Modeling Results to County <br />Construction Package to County <br />Delineate Drainage Areas <br />Construct Hydrologic Model <br />Conceptual Wetland Design and Modeling <br />Finalize Design and Model <br />Gravelly Hill Middle School Stormwater Wetland Conversion <br />Design Phase <br />Kickoff Meeting and Develop Project Schedule <br />Lump Sum <br />Lump Sum <br />Lump Sum <br />Exhibit B - Project Engineering Fee <br />Man-hour Estimate <br />Prepare Construction Documents, O&M Manual and EOPCC <br />Construction Services - Hourly <br />Site Visit <br />Field Survey <br />DocuSign Envelope ID: 55727B68-1DEF-4F9C-8CC8-C77A0A8B2148
The URL can be used to link to this page
Your browser does not support the video tag.