Browse
Search
2022-113-E-Planning-ECS Southeast-Construction materials testing_CMT_ for Lake Orange Erosion contraol barrier replacement project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-113-E-Planning-ECS Southeast-Construction materials testing_CMT_ for Lake Orange Erosion contraol barrier replacement project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 2:36:04 PM
Creation date
3/18/2022 2:35:50 PM
Metadata
Fields
Template:
Contract
Date
2/21/2022
Contract Starting Date
2/21/2022
Contract Ending Date
2/21/2022
Contract Document Type
Contract
Amount
$14,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2022 ECS SOUTHEAST, LLP <br />FEE SCHEDULE <br /> <br />Personnel <br /> <br />Senior Principal Engineer ............................................................................................................................$210.00/hour <br />Principal Engineer .......................................................................................................................................$190.00/hour <br />Senior Professional Engineer ......................................................................................................................$145.00/hour <br />Project Manager .........................................................................................................................................$120.00/hour <br />Assistant Project Manager ..........................................................................................................................$ 90.00/hour <br />Field Technician (**) ...................................................................................................................................$ 52.00/hour <br />ICC Technician (**) ......................................................................................................................................$ 70.00/hour <br />NCDOT Field Technician (**) ......................................................................................................................$ 70.00/hour <br />Senior Level AWS CWI (NDE: UT, MT, PT, RI) (**) ......................................................................................$100.00/hour <br />Secretary .....................................................................................................................................................$ 55.00/hour <br />Transportation via company or private vehicle..........................................................................................$ 0.75/mile <br /> <br />Note: Charges for engineering and technical personnel will be made for time spent in the field, in engineering <br />analysis, in preparation of reports, and in travel portal to portal from our office. For scheduling requests <br />received without sufficient notice as stated within the ECS proposal, services will be staffed with <br />available personnel at the associated unit rates. <br /> <br />(**) = Overtime = Standard Rate x 1.50 for over 8 hours per day and outside normal business hours of <br />7:00am to 5:00pm, holiday, Saturday, or Sunday <br /> <br />EQUIPMENT and LABORATORY <br /> <br />R-Meter ......................................................................................................................................................... $ 50.00/day <br />Core machine ................................................................................................................................................. $250.00/day <br />GPR Equipment .............................................................................................................................................. $175.00/day <br />Moisture Emission Test Kit ............................................................................................................................ $ 50.00/unit <br />Nuclear Density and Moisture Measuring Equipment .................................................................................. $ 50.00/day <br />Thin Lift Nuclear Gauge ................................................................................................................................. $ 50.00/day <br />Ultrasonic Equipment .................................................................................................................................... $100.00/day <br />Dipstick ......................................................................................................................................................... $150.00/day <br />Asphalt Bulk Specific Gravity ......................................................................................................................... $75.00 each <br />Windsor Probe Gun ....................................................................................................................................... $125.00/day <br />Windsor Probe Shots ..................................................................................................................................... $75.00/shot <br />Standard Proctor (ASTM D-698) .................................................................................................................... $150.00 each <br />Modified Proctor (ASTM D-1557) 4 inch mold .............................................................................................. $175.00 each <br />Atterberg Limits Testing ................................................................................................................................ $70.00 each <br />Wash 200 Sieve Analysis ................................................................................................................................ $55.00 each <br />Moisture Content .......................................................................................................................................... $12.00 each <br />Testing of Cylinders, Prisms, Cubes and Core Specimens: <br /> Compressive Strength of grout prisms (3.5”x3.5”x7”) ...................................................................... $ 20.00 each <br /> Compressive strength of mortar cubes .......................................................................................... $ 14.00 each <br /> Compressive strength of concrete cylinders including reserves, (ASTM C-39) ............................. $ 14.00 each <br /> Core Specimen (including sample preparation) ............................................................................. $ 30.00/test <br />Extra Molds - cylinder molds included in compressive strength rate (per case of 30) $ 65.00/case <br /> <br />Note: The above charges will be made for tests and equipment operated by ECS SOUTHEAST, LLP personnel in addition <br />to personnel charges already listed. Soil Samples requiring a turnaround time of less than 5 days will be billed <br />at 1.5 times the test unit rate. <br /> <br />DocuSign Envelope ID: 37E68F70-3B11-4314-9C2B-31C3A2887713
The URL can be used to link to this page
Your browser does not support the video tag.