Browse
Search
2022-110-E-Planning-Fred Smith Company-Construction of the Lake Orane Erision control barrier replacement project base bid scope only
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-110-E-Planning-Fred Smith Company-Construction of the Lake Orane Erision control barrier replacement project base bid scope only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 2:10:39 PM
Creation date
3/17/2022 2:04:32 PM
Metadata
Fields
Template:
Contract
Date
1/10/2022
Contract Starting Date
1/10/2022
Contract Ending Date
1/12/2022
Contract Document Type
Contract
Amount
$438,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:98CAB32E-1814-4C97-B61E-B14BE79B81EA <br /> Orange County,North Carolina <br /> Lake Orange Erosion Control Barrier Replacement <br /> When a contract is renewed or assigned <br /> N.C.G.S. 143C-6A-5(b) requires that contractors with the State, a North Carolina lor-al government, <br /> or any other political subdivision of the State of North Carolina must not utilire any subcontractor <br /> found on the State Treasurer's Final Divestment List.The State Treasurer's Final Divestment List. the <br /> State Treasurer's Final Divestment List can be found on the State Treasurer's website at the address <br /> www.nctreasurer.com/Iran and will be updated every 180 days. <br /> *****Contractor.Vendor or Bidder-Return This Form With All Other Reauired Documentation*" <br />
The URL can be used to link to this page
Your browser does not support the video tag.