Orange County NC Website
DocuSign Envelope ID:98CAB32E-1814-4C97-B61E-B14BE79B81EA <br /> Orange County,North Carol ina <br /> Lake Orange Erosion Control Barrier Replacement <br /> UNIT PRICES <br /> Unit prices are complete for labor, equipment, material, overhead and profit. Base Bid <br /> includes the stipulated allowance quantity of each item. Unused amount will be credited to the <br /> Owner by change order at the end of the project. Unit prices quoted and accepted shall apply <br /> throughout the life of the Contract, except as otherwise specifically noted. Unit prices shall be <br /> applied, as appropriate, to compare the total value of changes in the base bid quantity of the work <br /> and in the given Allowances all in accordance with the Contract Documents. <br /> Unit Description Allowance Unit Measure Unit Total Price <br /> Price No. uantit Price <br /> I NCDOT ABC Stone 40 Ton 75-.00 3 000.OD <br /> 2 / <br /> NCDOT Class B Stone 5 Ton t DO.00 5-00. 00 <br /> 3 Soil Backfill 75 Cubic Yard 200.00 15,-000.00 <br /> 4 Reinforced Concrete 65 Cubic Yard 1,Z00.00 76,,000.00 <br /> 5 Reinforcing Steel 9,181 Pounds Z3,$70, (ea <br /> 6 Unreinforced Concrete 20 Cubic Yard 37�00 7,S00. 00 <br /> The undersigned acknowledges receipt of the following Addenda issued during the time of <br /> bidding and includes the changes therein in this Bid Proposal: <br /> Addendum Number Dated 11�ZZ�ZoZI <br /> Addendum Number Dated <br /> Addendum Number Dated <br /> Addendum Number . Dated <br /> The undersigned agrees that this Bid Proposal will not be withdrawn fora period of sixty(60) <br /> consecutive calendar days. <br /> The undersigned agrees to ensure compliance with the E-Verify requirements of the General <br /> Statutes of North Carolina, all contractors, including any subcontractors employed by the <br /> contractor(s), by submitting a Bid Proposal or any other response, or by providing any material, <br /> equipment,supplies,services,etc..attest and affirm that they are aware and in full compliance with <br /> Article 2 of Chapter 64, (NCGS64-26(a)) relating to the E-Verify requirements. <br /> The undersigned further agrees that in the case of failure on his part to execute the said <br /> Contract and the Bond within ten (10)consecutive calendar days after written notice being given of <br /> the award of the Contract,the check,cash or Bid Bond accompanying this Bid shall be paid into the <br /> funds of Owner's Account set aside for this Project, as liquidated damages for such failure; <br /> otherwise, the check, cash or Bid Bond accompanying this Bid Proposal shall be returned to the <br /> undersigned. <br /> By acceptance of this con tract!purchase order or by submission of any Bid Proposal, etc, <br /> vendors, contractors, and"or subcontractors affirm they are not listed on the Final Divestment List <br /> Bid Proposal Form 004000-2 <br />