Browse
Search
2022-110-E-Planning-Fred Smith Company-Construction of the Lake Orane Erision control barrier replacement project base bid scope only
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-110-E-Planning-Fred Smith Company-Construction of the Lake Orane Erision control barrier replacement project base bid scope only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 2:10:39 PM
Creation date
3/17/2022 2:04:32 PM
Metadata
Fields
Template:
Contract
Date
1/10/2022
Contract Starting Date
1/10/2022
Contract Ending Date
1/12/2022
Contract Document Type
Contract
Amount
$438,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:98CAB32E-1814-4C97-B61 E-1314BE791381 EA <br /> Orange County,North Carolina <br /> Lake Orange Erosion Control Barricr Replacement <br /> E. The name and home office address of the Surety proposed and the name and address <br /> of the responsible local claim agent. <br /> F. The names of members of the firm who hold appropriate trade licenses,together with <br /> license numbers. <br /> G. Complete list of all subcontractors and suppliers proposed. <br /> H. Any pending arbitration or mediation cases or lawsuits. This may include all <br /> arbitration, mediation and lawsuits settled or resolved within last ten (10) years. <br /> Failure or refusal to furnish any of the above information if requested shall constitute a basis <br /> for disqualification of any Bidder. <br /> In determining the lowest responsible Bidder,the Owner may consider the past performance <br /> of the Bidder on construction contracts for Orange County, the State of North Carolina or other <br /> governmental agencies. Particular concern will be given to completion times, quality of work, <br /> cooperation with other Contractors, and cooperation with the Engineer and Owner. <br /> Should the Owner adjudge that the apparent low Bidder is not the lowest "responsible" <br /> Bidder by virtue of the above information, said apparent low Bidder will be so notified and his Bid <br /> Security shall be returned to him/her. <br /> The Owner shall have the right to accept Alternates in any order or combination and to <br /> determine the low Bidder on the basis of the sum of the Base Bid and the Alternates accepted. <br /> The Owner reserves the right to reject any and all Bids, to waive all technicalities and <br /> irregularities, and to make the award as considered to be in the best interest of the Owner. <br /> 10. PERFORMANCE BOND <br /> The successful Bidder, upon award of Contract, shall furnish a Performance Bond in an <br /> amount equal to one hundred percent (100°o) of the Contract price. <br /> IL PAYMENT BOND <br /> The successful Bidder,upon award of Contract,shall furnish a Payment Bond in an amount <br /> equal to one hundred percent (100°-o)of the Contract price. <br /> 12. BID PROPOSALS TO BE BID <br /> Single Prime Construction Work <br /> 13. INFORMATION TO BIDDER <br /> Instructions to Bidders 0030006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.