Browse
Search
2022-110-E-Planning-Fred Smith Company-Construction of the Lake Orane Erision control barrier replacement project base bid scope only
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-110-E-Planning-Fred Smith Company-Construction of the Lake Orane Erision control barrier replacement project base bid scope only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 2:10:39 PM
Creation date
3/17/2022 2:04:32 PM
Metadata
Fields
Template:
Contract
Date
1/10/2022
Contract Starting Date
1/10/2022
Contract Ending Date
1/12/2022
Contract Document Type
Contract
Amount
$438,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:98CAB32E-1814-4C97-B61E-B14BE79B81EA <br /> Orange County,North Carolina <br /> Lake Orange Erosion Control Barrier Replacement <br /> 8. REJECTION OF BID PROPOSALS <br /> The Owner reserves the unqualified right to reject any and all Bid Proposals. Reasons for Bid <br /> Proposal rejection may include, but shall not be limited to, the following: <br /> A. If the Bid Proposal Form furnished to the Bidder is not used or is altered. <br /> B. If the Bidder fails to insert a price for all Base Bid items, Alternates and Unit Prices <br /> requested. <br /> C. If the Bidder adds any provisions reserving the right to accept or reject any award. <br /> D. If there are unauthorized additions or conditional Bid Proposals,or irregularities of <br /> any kind which tend to make the Bid Proposal incomplete,indefinite,or ambiguous <br /> as to its meaning. <br /> E. If the Bidder fails to complete the Bid Proposal Form where information is requested <br /> so the Bid Proposal may be properly evaluated by the Owner. <br /> F. If the Unit Prices contained in the Bid Proposal For n are unacceptable to the Owner. <br /> G. If the Bidder fails to comply with other instructions stated herein, <br /> 9. BID PROPOSAL EVALUATION <br /> The award of the Contract will be made to the lowest responsible Bidder as soon as practical. <br /> Should the successful Bidder default and fail to execute a Contract,the Contract may be awarded to <br /> the next lowest and responsible Bidder. <br /> Before awarding a Contract, the Owner may require the apparent low Bidder to qualify <br /> himself herself to be a responsible Bidder by furnishing any or all of the following data: <br /> A. The latest financial statement showing assets and liabilities of the company or other <br /> information satisfactory to the Owner. <br /> B. A listing of similar completed projects of similar size, with contact persons and <br /> telephone numbers. <br /> C. Permanent name and address of place of business. <br /> D. The number of regular employees of the organization and length of time the <br /> organization has been in business under present name and percentage of work <br /> typically perfonned by the contractor's firm. <br /> (1) Qualifications of key employees assigned to this Project. <br /> (2) References for key employees assigned to this Project. <br /> Instructions to Bidders 003000-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.