Browse
Search
2022-110-E-Planning-Fred Smith Company-Construction of the Lake Orane Erision control barrier replacement project base bid scope only
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-110-E-Planning-Fred Smith Company-Construction of the Lake Orane Erision control barrier replacement project base bid scope only
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 2:10:39 PM
Creation date
3/17/2022 2:04:32 PM
Metadata
Fields
Template:
Contract
Date
1/10/2022
Contract Starting Date
1/10/2022
Contract Ending Date
1/12/2022
Contract Document Type
Contract
Amount
$438,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:98CAB32E-1814-4C97-B61E-B14BE79B81EA <br /> shall immediately, at Contractor's expense, correct the Work. Any such rejection may be <br /> made before or after substantial completion. If applicable, any additional expense borne by the <br /> Designer under this section shall be paid at Contractor's expense. <br /> e. The County has designated (Christopher J. Sandt, P.E.) to act as the County's representative <br /> with respect to the Project and shall have the authority to render decisions within guidelines <br /> established by the County Manager or the County Board of Commissioners and shall be <br /> available during working hours as often as may be reasonably required to render decisions and <br /> to furnish information. <br /> f. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in its <br /> entirety without the prior written consent of the Owner. <br /> g. In the event of a breach by Contractor Owner has sole authority to determine the <br /> reasonableness of Contractor's actions to remedy such breach or complete the performance of <br /> its obligations. <br /> h. Upon request of the Owner, the Contractor shall submit to County all relevant documentation, <br /> including but not limited to,job cost records, to support its claims for final compensation and <br /> if such request is made final compensation shall not be due until all relevant documentation is <br /> received,reviewed, and approved by Owner. <br /> 9. CONSEQUENTIAL DAMAGES <br /> a. Owner and Contractor mutually waive any claim against each other for consequential damages. <br /> Consequential Damages include: <br /> (i) Damages incurred by Owner for loss of use, income, financing, or business. <br /> (ii) Damages incurred by Contractor for office expenses, including personnel, loss of <br /> financing, profit, income, business, damage to reputation, or any other non-direct <br /> damages. <br /> 10. ENTIRE AGREEMENT <br /> All of the documents listed,referenced or described in this Agreement, the written Notice-to-Proceed, <br /> together with Modifications made or issued in accordance herewith are the Contract Documents, and the work, <br /> labor, materials, and completed construction required by the Contract Documents and all parts thereof is the <br /> Work. The Contract Documents constitute the entire agreement between Owner and Contractor. This <br /> Agreement may be amended only by written instrument signed by both parties. Modifications may be <br /> evidenced by facsimile signatures. If any provision of the Agreement or General Conditions shall be declared <br /> invalid or unenforceable,the remainder of the Agreement shall continue in full force and effect. <br /> [SIGNATURE PAGE TO FOLLOW] <br /> Revised 06/21 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.