Orange County NC Website
DocuSign Envelope ID:98CAB32E-1814-4C97-B61 E-1314BE791381 EA <br /> 42 <br /> ARTICLE 25. CONTRACTOR AND SUBCONTRACTOR RELATIONSHIPS <br /> 25.1 Within thirty (30) days after initial receipt of the Construction Contract for signatures the <br /> Contractor shall submit to the Designer and Owner for acceptance a current list of the names of <br /> Subcontractors and such other persons and organizations (including those who are to furnish <br /> materials or equipment fabricated to a special design) proposed for any and all portions of the <br /> Work. The Contractor shall provide this list at this time even if the Contractor was required to <br /> submit a list of proposed Subcontractors with the Contractor's bid. The Designer shall promptly <br /> reply to the Contractor in writing stating whether or not the Owner or the Designer, after due <br /> investigation, has objection to any such proposed person or entity or if it needs additional <br /> information to evaluate the persons on the list. Failure of the Designer to reply within ten (10) <br /> days after the Contractor has furnished all required information shall constitute notice of no <br /> objection. <br /> The Contractor shall not contract with any such proposed person or entity to whom the Owner <br /> or the Designer has made reasonable objection. If the Designer or Owner has reasonable <br /> objection to any such proposed person or entity, the Contractor shall submit a substitute to <br /> whom the Owner and the Designer have no reasonable objection. The Contractor shall make no <br /> substitution for any Subcontractor, person, or entity previously allowed without first notifying the <br /> Designer and Owner in writing and no substitution may be made if the Owner or Designer <br /> makes a reasonable objection to such substitution. <br /> 25.2 The Contractor agrees that the terms of the Contract Documents, including all portions <br /> thereof, shall apply to all Subcontractors of the Contractor as if they were the Contractor, and <br /> that the Subcontractors of the Contractor shall, by means of their subcontracts, be bound by all <br /> the terms of the Contract Documents including, but not limited to, Article 26 of these General <br /> Conditions. <br /> 25.3 Payments to Subcontractors shall be made in accordance with the provisions of N.C. Gen. <br /> Stat. §143-134.1. <br /> ARTICLE 26. USE OF PREMISES <br /> 26.1 The Contractor shall confine apparatus, the storage of materials, the operations of workers, <br /> and the disposal of material to limits indicated by law, ordinances, permits, and directions of the <br /> Designer, if any. <br /> 26.2 The Contractor shall not load or permit any part of the Work to be loaded with a weight that <br /> will endanger its safety, intended performance, or configuration. <br /> 26.3 The Contractor shall enforce all of the Designer's instructions, including, but not limited to, <br /> those regarding signs, advertisements, fires, and smoking. <br /> ARTICLE 27. CUTTING, PATCHING AND FITTING <br /> 27.1 The Contractor shall do all cutting, fitting, and patching of the Work that may be required to <br /> make its several parts come together properly and fit it to receive or to be received by Work <br /> shown in or which can be reasonably implied from the Contract Documents. <br /> Revised 06/21 <br />