Orange County NC Website
Here is the data: <br />Change Order #2 - Mop Closet Doors $2,540.00 <br />Change Order #3 - Lentels $1,033.00 <br />Change Order #4 - Wood Door Swap $727.00 <br />Change Order #5 - Dumpster Coral Removal $2,363.00 <br />Change Order #6 - IT Closet Changes $3,337.00 <br />Change Order #7 - Adjustments to Freaming -$300.00 <br />Change Order #8 - Re-wiring $7,683.00 <br />Change Order #9 - Transfer grill and Fans $986.00 <br />Change Order #10 - (Rejected ) $0.00 <br />Change Order #11 - Replace Toilets $752.00 <br />Change Order #12R - Outside Repairs $17,983.00 <br />Change Order #13 - Electrical Work $4,592.00 <br />Change Order #14 - (Rejected -vents) $0.00 <br />Change Order #15 - Life saftey $2,309.00 <br />Change Order #16 (Rejected - addational <br />Pating) <br />$0.00 <br />Change Order #17 - Carpet Installation -$530.00 <br />Change Order #18 - wood work $295.00 <br />Total: $43,770.00 <br /> <br />DocuSign Envelope ID: AD739F8A-DC0E-420A-8A82-5B83E8828F75