Browse
Search
2022-106-E-AMS-Racanelli Construction South-Various additions to Visitors Bureau
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-106-E-AMS-Racanelli Construction South-Various additions to Visitors Bureau
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 2:00:22 PM
Creation date
3/16/2022 1:59:23 PM
Metadata
Fields
Template:
Contract
Date
2/18/2022
Contract Starting Date
2/18/2022
Contract Ending Date
3/16/2022
Contract Document Type
Contract
Amount
$43,770.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Visitor Center <br />Racanelli Change Order Request <br />Racanelli Construction South, Inc.Proposal and Pricing Summary <br />1091 Pemberton Hill Road, Suite 102 RCS Project #20-008 <br />Apex, NC 27502 Date:7/21/2021 <br />Submitted To: <br />JGA Architects <br />308 West Rosemary Street <br />Chapel Hill, NC 27516 <br />Attention : Josh Gurlitz via email <br />Item Qty Unit <br />Labor <br />Unit <br />Price <br />Material <br />Unit <br />Price <br />Sub Unit <br />Price <br />Labor <br />Total <br />Material <br />Total <br />Subcontractor <br />Total Total <br />1 <br />Martin Architectural Products: Quote: <br />(attached)1 LS $ 2,365.00 $ 2,365.00 $ 2,365.00 <br />2,365.00$ 2,365.00$ <br />Small Tools & Consumables @ %on -$ <br />General Conditions -$ <br />Labor Burden 38%on $0 -$ <br />Sales Tax on Materials 7.25%on $0 -$ <br />Racanelli Construction South Overhead & Profit @ 10%on of RCS's work -$ <br />Racanelli Construction South Overhead & Profit @ 5%on 2,365.00$ of Subcontractors work 118.25$ <br />Bond & Insurance Premium @ 2.3%on 2,483.25$ 57.11$ <br />TOTAL AMOUNT OF CHANGE ORDER REQUEST 2,540$ <br />TOTAL TIME (CALENDAR DAYS) REQUESTED FOR THIS CHANGE 0 <br />Authorized By Architect:Date: <br />CC: <br />COR# 2 <br />Per sheet A103 there is no schedule for the double doors at the mop closet. We are pleased to provide the following <br />change order request to provide doors, frame, and hardware. <br /> Change Order Request accepted and authorized for contract Change Order <br />Notes: We reserve the right to claim additional cost and time extensions associated with this COR at a later time. <br />We Have Not been authorized to proceed with this work. <br />This Proposal may be withdrawn from us if not accepted within 10 Days. <br />By: Peter K. Muzzillo <br />Project Manager <br />DocuSign Envelope ID: AD739F8A-DC0E-420A-8A82-5B83E8828F75
The URL can be used to link to this page
Your browser does not support the video tag.