Orange County NC Website
Orange County Visitor Center <br />Racanelli Change Order Request <br />Racanelli Construction South, Inc.Proposal and Pricing Summary <br />1091 Pemberton Hill Road, Suite 102 RCS Project #20-008 <br />Apex, NC 27502 Date:9/28/2021 <br />Submitted To: <br />JGA Architects <br />308 West Rosemary Street, Suite 302 <br />Chapel Hill, NC 27516 <br />Attention : Josh Gurlitz <br />Item Qty Unit <br />Labor <br />Unit <br />Price <br />Material <br />Unit <br />Price <br />Sub Unit <br />Price <br />Labor <br />Total <br />Material <br />Total <br />Subcontractor <br />Total Total <br />1 In wall data conduit 1 LS $ 2,000.00 $ - $ - $ 2,000.00 $ 2,000.00 <br />2 Floor box race way 1 LS $ 4,000.00 $ - $ - $ 4,000.00 $ 4,000.00 <br />3 2x2 White Access Panels 1 LS $ 122.24 $ - $ - $ 122.24 $ 122.24 <br />4 RCS Labor to install access panels 3 HRS $ 35.00 $ 105.00 $ 105.00 $ - $ - $ 105.00 <br />5 RCS Supervision of electrical work 8 HRS $ 50.00 $ 400.00 $ 400.00 $ - $ - $ 400.00 <br />6 Paint Conduit 1 LS $ 300.00 $ 300.00 $ 300.00 <br /> $ - $ - $ - <br /> $ - $ - $ - <br /> $ - $ - $ - <br /> $ - $ - $ - <br />505.00$ -$ 6,422.24$ 6,927.24$ <br />Small Tools & Consumables @ %on -$ <br />General Conditions -$ <br />Labor Burden 38%on $505 191.90$ <br />Sales Tax on Materials 7.25%on $0 -$ <br />Racanelli Construction South Overhead & Profit @ 10%on 696.90$ of RCS's work 69.69$ <br />Racanelli Construction South Overhead & Profit @ 5%on 6,422.24$ of Subcontractors work 321.11$ <br />Bond & Insurance Premium @ 2.3%on 7,509.94$ 172.73$ <br />TOTAL AMOUNT OF CHANGE ORDER REQUEST 7,683$ <br />TOTAL TIME (CALENDAR DAYS) REQUESTED FOR THIS CHANGE 5 <br />Authorized By Architect:Date: <br />CC: <br />COR# 8R1 <br />Per IT departments request to run individual raceways to the above ceiling. We are pleased to offer the following proposal <br />to run raceways individually in wall and terminate above ceiling. As per the 9/23 onsite meeting we propose to run floor <br />boxes and window data to the attic area incased in one surface mounted conduit to be painted in field. Cost includes (2) <br />access panels and blocking. Please note the additional data boxes that were added will be submitted separate. <br /> Change Order Request accepted and authorized for contract Change Order <br />Notes: We reserve the right to claim additional cost and time extensions associated with this COR at a later time. <br />We Have Not been authorized to proceed with this work. <br />This Proposal may be withdrawn from us if not accepted within 10 Days. <br />By: Peter K. Muzzillo <br />Project Manager <br />DocuSign Envelope ID: AD739F8A-DC0E-420A-8A82-5B83E8828F75