Browse
Search
2022-106-E-AMS-Racanelli Construction South-Various additions to Visitors Bureau
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-106-E-AMS-Racanelli Construction South-Various additions to Visitors Bureau
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 2:00:22 PM
Creation date
3/16/2022 1:59:23 PM
Metadata
Fields
Template:
Contract
Date
2/18/2022
Contract Starting Date
2/18/2022
Contract Ending Date
3/16/2022
Contract Document Type
Contract
Amount
$43,770.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Visitor Center <br />Racanelli Change Order Request <br />Racanelli Construction South, Inc.Proposal and Pricing Summary <br />1091 Pemberton Hill Road, Suite 102 RCS Project #20-008 <br />Apex, NC 27502 Date:8/4/2021 <br />Submitted To: <br />JGA Architects <br />308 West Rosemary Street, Suite 302 <br />Chapel Hill, NC 27516 <br />Attention : Josh Gurlitz <br />Item Qty Unit <br />Labor <br />Unit <br />Price <br />Material <br />Unit <br />Price <br />Sub Unit <br />Price <br />Labor <br />Total <br />Material <br />Total <br />Subcontractor <br />Total Total <br />1 MAP Change Order Proposal: (Attached)1 LS $ 677.26 $ 677.26 $ 677.26 <br />2 <br />3 <br />4 <br />5 <br />677.26$ 677.26$ <br />Small Tools & Consumables @ %on -$ <br />General Conditions -$ <br />Labor Burden 38%on $0 -$ <br />Sales Tax on Materials 7.25%on $0 -$ <br />Racanelli Construction South Overhead & Profit @ 10%on -$ of RCS's work -$ <br />Racanelli Construction South Overhead & Profit @ 5%on 677.26$ of Subcontractors work 33.86$ <br />Bond & Insurance Premium @ 2.3%on 711.12$ 16.36$ <br />TOTAL AMOUNT OF CHANGE ORDER REQUEST 727$ <br />TOTAL TIME (CALENDAR DAYS) REQUESTED FOR THIS CHANGE 0 <br />Authorized By Architect:Date: <br />CC: <br />COR# 4 <br />We are pleased to offer the following change order request to furnish and install solid core wood door finished to match <br />approved stain color Caramel. This cost includes an expedited fee to receive doors in 4-5 weeks in lieu of 12-14 weeks <br />with extended factory lead times. <br /> Change Order Request accepted and authorized for contract Change Order <br />Notes: We reserve the right to claim additional cost and time extensions associated with this COR at a later time. <br />We Have Not been authorized to proceed with this work. <br />This Proposal may be withdrawn from us if not accepted within 10 Days. <br />By: Peter K. Muzzillo <br />Project Manager <br />DocuSign Envelope ID: AD739F8A-DC0E-420A-8A82-5B83E8828F75
The URL can be used to link to this page
Your browser does not support the video tag.