Browse
Search
2022-103-E-AMS-TRI Solutions-Justice Facility VCT Epic Coating
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-103-E-AMS-TRI Solutions-Justice Facility VCT Epic Coating
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 2:04:46 PM
Creation date
3/14/2022 2:04:31 PM
Metadata
Fields
Template:
Contract
Date
3/1/2022
Contract Starting Date
3/1/2022
Contract Ending Date
3/14/2022
Contract Document Type
Contract
Amount
$6,135.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50% of Proposal Due Before Work is Scheduled Deposit Due <br />Sales and Use Tax (if <br />applicable) <br />$ 0.00 <br />Terms: Net 20 Days Total $ 0.00 <br />Corporate Office:712 Summit Ave, Kinston, NC 28501 <br />South Carolina Office: 7001 St Andrews Road, #370, Columbia, SC 29212 <br />Phone: 1-866-327-4600 Fax: 1-252-376-1452 <br />Orange Co - Justice Facility VCT Epic Coating _Various Areas <br />Pricing is based on completing each area listed above in a single mobilization. <br />Sales and Use Tax will be added once a final scope of work is determined. <br />Freddy Brooks <br />Orange County Public Works <br />600 Highway 86 North <br />Hillsborough, NC 27278 <br />Phone:919-245-2636 <br />Fax:919-644-3043 <br />Email:fbrooks@orangecountync.gov <br />Date: Feb 18, 2022 11:41 AM <br />Rep.: Brad Albritton <br />Cell : 252-916-2045 <br />Email: brada@tilerestorationinc.com <br />Units Process Description of Area Price Per Price <br /> 1 460 Ultra Durable Epic <br />Urethane <br />Battle Court Room Ground Floor Hallway and Stairwell <br />Labor and Materials for EPIC Urethane Application to VCT <br />Flooring. <br />Pricing Includes: <br />-Strip and clean VCT flooring <br />-Application of EPIC Urethane (1 coat) <br /> $ 3,215.00 $ 3,215.00 <br /> 1 460 Ultra Durable Epic <br />Urethane <br />Clerk Break Room <br />Labor and Materials for EPIC Urethane Application to VCT <br />Flooring. <br />Pricing Includes: <br />-Strip and clean VCT flooring <br />-Application of EPIC Urethane (1 coat) <br /> $ 920.00 $ 920.00 <br /> 1 460 Ultra Durable Epic <br />Urethane <br />Steps and Landings from Ground Floor to 1st Floor <br />Labor and Materials for EPIC Urethane Application to VCT <br />Flooring. <br />Pricing Includes: <br />-Strip and clean VCT flooring <br />-Application of EPIC Urethane (1 coat) <br /> $ 1,000.00 $ 1,000.00 <br /> 1 460 Ultra Durable Epic <br />Urethane <br />Steps and Landings from 1st Floor to 2nd Floor <br />Labor and Materials for EPIC Urethane Application to VCT <br />Flooring. <br />Pricing Includes: <br />-Strip and clean VCT flooring <br />-Application of EPIC Urethane (1 coat) <br /> $ 1,000.00 $ 1,000.00 <br />1 <br />DocuSign Envelope ID: C3002DBA-4BD7-42B8-8770-C7716BF90543
The URL can be used to link to this page
Your browser does not support the video tag.