Browse
Search
2022-103-E-AMS-TRI Solutions-Justice Facility VCT Epic Coating
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2022
>
2022-103-E-AMS-TRI Solutions-Justice Facility VCT Epic Coating
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 2:04:46 PM
Creation date
3/14/2022 2:04:31 PM
Metadata
Fields
Template:
Contract
Date
3/1/2022
Contract Starting Date
3/1/2022
Contract Ending Date
3/14/2022
Contract Document Type
Contract
Amount
$6,135.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 11/19 <br />1 <br /> [Departmental Use Only] <br /> TITLE Floor Coating <br /> FY 2021/2022 <br />NORTH CAROLINA <br /> SERVICES AGREEMENT NO RFP/RFQ <br /> <br />ORANGE COUNTY <br /> <br /> This Services Agreement (hereinafter “Agreement”), made and entered into this 2nd day of <br />March, 2022, (“Effective Date”) by and between Orange County, North Carolina a political <br />subdivision of the State of North Carolina (hereinafter, the "County") and TRI Solutions, <br />(hereinafter, the "Provider"). <br /> <br />WITNESSETH: <br /> <br /> That the County and Provider, for the consideration herein named, do hereby agree as <br />follows: <br /> <br />1. Services <br /> <br />a. Scope of Work. <br /> <br />i) This Agreement is for services to be rendered by Provider to County with respect <br />to (insert type of project): 460 Ultra Durable Epic Urethane:Battle Court Room <br />Ground Floor Hallway and StairwellLabor and Materials for EPIC Urethane <br />Application to VCT Flooring.Pricing Includes: -Strip and clean VCT flooring- <br />Application of EPIC Urethane (1 coat), 1 460 Ultra Durable Epic Urethane Clerk <br />Break Room Labor and Materials for EPIC Urethane Application to VCT Flooring. <br />Pricing Includes:-Strip and clean VCT flooring-Application of EPIC Urethane (1 <br />coat), 1 460 Ultra Durable Epic Urethane Steps and Landings from Ground Floor to <br />1st Floor Labor and Materials for EPIC Urethane Application to VCT Flooring. <br />Pricing Includes:-Strip and clean VCT flooring-Application of EPIC Urethane (1 <br />coat) 1 460 Ultra Durable Epic Urethane Steps and Landings from 1st Floor to 2nd <br />Floor Labor and Materials for EPIC Urethane Application to VCT Flooring. Pricing <br />Includes: -Strip and clean VCT flooring -Application of EPIC Urethane (1 coat <br /> <br />ii) By executing this Agreement, the Provider represents and agrees that Provider is <br />qualified to perform and fully capable of performing and providing the services <br />required or necessary under this Agreement in a fully competent, professional and <br />timely manner. <br /> <br />iii) Time is of the essence with respect to this Agreement. <br /> <br />iv) The services to be performed under this Agreement consist of Basic Services, as <br />described and designated in Section 3 hereof. Compensation to the Provider for <br />Basic Services under this Agreement shall be as set forth herein. <br /> <br />2. Responsibilities of the Provider <br /> <br />DocuSign Envelope ID: C3002DBA-4BD7-42B8-8770-C7716BF90543
The URL can be used to link to this page
Your browser does not support the video tag.