Orange County NC Website
7 <br /> 1 Slide #6 <br /> I`,!u 1995 2020 2045 2070 <br /> I i <br /> University Lake.450 million gallons <br /> Cane Creek Re5ervoir;3 billion gallons <br /> Quarry Reservok Phase 2; 1.5 bllllon gal Ion: <br /> Jordan Lake Alloca%lon,750 mill Ion gtllons , __ _ _ _ _ _ _ L <br /> 2 <br /> 3 Ruth Rouse said that OWASA has traditionally proactively planned. She said that the <br /> 4 Cane Creek Reservoir was identified as a water supply before OWASA was formed and came <br /> 5 online 20 years afterwards. She said the existing quarry was planned in the 1990's and will not <br /> 6 come to fruition until 2030-2035. She said that they have had a Jordan Lake allocation since <br /> 7 1988 but there is no guaranteed way to get the water from the lake so if it is ever needed, there <br /> 8 may be no way of accessing it. <br /> 9 <br /> 10 Slide #7 <br /> Jordan Labe Water <br /> Quality <br /> • Hundreds of thousands of �* <br /> ppeople drink treated water <br /> frorn Jordan Lake daily <br /> • Reviewed drinking water <br /> quality from Cary and Chatham <br /> County <br /> • D ri n k Ing water f rom Jord a n <br /> Lake meets all state and federal 4 <br /> criteria <br /> • Proposed WTP being designed <br /> to remove contaminantsof <br /> emerging concern <br /> 11 <br />