Browse
Search
Agenda - 12-09-2003-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 12-09-2003
>
Agenda - 12-09-2003-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:22:38 PM
Creation date
8/29/2008 10:36:50 AM
Metadata
Fields
Template:
BOCC
Date
12/9/2003
Document Type
Agenda
Agenda Item
8g
Document Relationships
2003 NS Purchasing - Innovative Design for Wastewater Treatment Design Services at NHSC and Feasibility Analysis of Sustainable Design Elements
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20031209
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The following outlines the bast audit and analysis costs that will occur. regardless of the <br />specific measures selected. This scope assumes that there are "As-Built ~ plans for the <br />facility and that additional. detailed lield work is no[ required to determine the existing <br />conditions. <br />Base Tasks <br />task Base I: Complete audit of the facility <br />ID 8 hours at $125/hour $ 1,000 <br />12 hours at $90/hour $ 1,080 <br />Padia G hours at $125/hour $ 720 <br />8 hours at $90/hour $ '720 <br />Task Base 2: Input of base building into the DOE Il <br />energy simulation <br />Padia 40 hours at $90/hour $ 3,600 <br />Task Base 3: Coordination with Orange County <br />staff, interim review, information <br />gathering, and final presentation to Orange <br />1D 20 hours at $125/hour $ 2,500 <br />30 hours at $90/hour $ 2,700 <br />20 hours at $50/hour $ 1,000 <br />Padia 8 hours at $125/hour $ 1,000 <br />4 hours at $90/hour $ 360 <br />Total Base Costs $14,680 <br />The proposed analysis of sustainable options arc broken down into the categories of <br />energy, water, and green products and systems. <br />Energy <br />__ Task E1: Daylighting/window strategies <br />1D 5 strategies x l0 hours x $90/hour $ 4,500 <br />2 hours x $125/hour $ 250 <br />Padia 2 strategies x 4 hours x $90/hour $ 720 <br />1 hour x $125/hour $ 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.