Browse
Search
Agenda - 12-09-2003-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 12-09-2003
>
Agenda - 12-09-2003-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:22:38 PM
Creation date
8/29/2008 10:36:50 AM
Metadata
Fields
Template:
BOCC
Date
12/9/2003
Document Type
Agenda
Agenda Item
8g
Document Relationships
2003 NS Purchasing - Innovative Design for Wastewater Treatment Design Services at NHSC and Feasibility Analysis of Sustainable Design Elements
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20031209
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Actual design to complete the work identified would be an additional contract brought forward <br />for Board consideration as work may be funded and scheduled. <br />Item #2 seeks Board approval for the design of the wastewater treatment system using Living <br />Machine or equal technology. As the Board will recall, this technology creates a wetlands <br />environment that naturally treats waste and produces clean water that may subsequently be <br />used for other uses that do not require potable water (such as irrigation). As indicated earlier, a <br />grant request to support the educational component of this project is not likely to be funded and <br />as such will not be constructed at this time. The absence of the educational component will not <br />impact the proper function of the system. <br />The consultant indicates that the project should be designed and ready to bid by March 1, 2004. <br />FINANCIAL IMPACT: The cost of design and construction management services associated <br />with the construction of the wastewater treatment system as quoted by Innovative Design is <br />$72,500. The funds to accomplish the work are budgeted in the Northern Human Services <br />Center capital project fund. <br />Funds are available in the NHSC capital project fund to support the $36,410 contract cost. <br />RECOMMENDATION(S): The Manager recommends that the Board: <br />1. Exempt this contract from the architect/engineering selection process as provided in GS <br />143-64-32; <br />2.. Approve a contract with Innovative Design to conduct a feasibility analysis of elements <br />as identified in the proposal dated April 27, 2003 in an amount not to exceed $36,410; <br />and <br />3. Approve a contract consistent with the attached cost proposal from Innovative Design <br />to design a wastewater treatment system using living machine technology in an amount <br />not to exceed $72,500, plus incidental expenses that will be paid to consultant on a <br />reimbursement basis; and <br />4.. Authorize the Chair to sign contracts, contingent upon County Attorney and staff review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.