Browse
Search
Agenda - 12-09-2003-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 12-09-2003
>
Agenda - 12-09-2003-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:22:38 PM
Creation date
8/29/2008 10:36:50 AM
Metadata
Fields
Template:
BOCC
Date
12/9/2003
Document Type
Agenda
Agenda Item
8g
Document Relationships
2003 NS Purchasing - Innovative Design for Wastewater Treatment Design Services at NHSC and Feasibility Analysis of Sustainable Design Elements
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20031209
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~ <br />Task 2A Revises Mssting whh County <br />This meeting would take place to review progress and receive input from the County. The meeting would take <br />place after the consWction documents plans are reviewed by the county.. If the scope has changed, we will also <br />provide a new anticipated budget y <br />Task 2.ti Coordinatbn with Rsvisw Agencies <br />This work would Include up l012 meetings total with the following approving agencies: <br />-Concept with Orange County Headh Department <br />- Concept with DENR Regional Soll Specialist <br />-Concept with DENR OnSite Wastewater Program <br />-Site approval with Orenge County Health Department <br />- Site approval with DENR Regional Soli Specialist <br />-Site hydraulic approval with DENR OnSite Wastewater Progrem Engineer <br />- Engfneefing design approval with DENR On-Site Wastewater Program Engineer <br />- Preliminary A&E review with County <br />-Final A&E review with County <br />Any meetings required, beyond 12 would be considered additional services. <br />Task 3: Bidding <br />The task will involve assisting the county in conducting normal Bidding the project <br />Task 4: Construction Administration <br />This task will involve tasks normally Involved in ConstrucWn Administration, Including the review of shop <br />drawings, processing payment requests and dtange orders, and conducting srie visits. <br />Task 5: Commissioning <br />Once the project has been completed the engineers from the l)ving Machine will make a specific commissioning <br />trip that will include an operedonal instruction sessbn. The Living Machine engineers will also assist the county in <br />locating optional maintenance personnel, help the county to evaluate their suitabdfty, and assist the county in <br />creating a fair maintenance contract with the preferred maintenance provider. <br />Optional Eco-Educational Task <br />This system will serve as an innovative environmental waste water treatment strategy, ran function as a unique <br />aducationai tool for eco•aducadon, As a option to our basic services, we will provide educational slgnage and a <br />display that e~Iains the system's operation, <br />9 'd 898Y'~N N91S30 3Al1V~ONNI Wdb9~l 8004 '9 '^~N <br />
The URL can be used to link to this page
Your browser does not support the video tag.