Browse
Search
Agenda - 12-09-2003-8g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 12-09-2003
>
Agenda - 12-09-2003-8g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:22:38 PM
Creation date
8/29/2008 10:36:50 AM
Metadata
Fields
Template:
BOCC
Date
12/9/2003
Document Type
Agenda
Agenda Item
8g
Document Relationships
2003 NS Purchasing - Innovative Design for Wastewater Treatment Design Services at NHSC and Feasibility Analysis of Sustainable Design Elements
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20031209
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County - LNing Marhlne Proposal <br />Task 1.6 Cost Estimate <br />Based upon the recommended strategy, we will refine our cost estimate. <br />Task 1.7 Presentation of Recommended Strategy <br />Once we complete the work listed above, we will make a presentation to the county on the results of this Task 1 <br />work. <br />Task 2: Construction Documents <br />Assuming acceptance of Task 1 results and your desire to continue, we will complete the design the system. This <br />work wlil be completed in two stages and presented to you for your review at each stage of design. The first will <br />be at prellminary design and the second will be at construction documents, <br />Task 2.1 Preltminary Dealpn (Equivalent oT Design DevalopmeM) <br />Ottca the major components of the system are Iderrtltled and spedficaly located on the site and the major <br />remificatbns addressed (issues in Tesk 1,1 through 1,4), we will submH Design Development Plans on: <br />-Main Tidal, Vertipi Flow system (design and speciflcetlons by Living Machine engineers) <br />- Plumbing and Electrical nrodificetions and incorporation of TVF plans into over engineering documents <br />(design and specifications by Padia Consulting) <br />-Architecturel, egress, edugtional, and safety design issues (design and specifications 6y Innovative Design) <br />-Subsurface design (design and spedfieationa by Living Machine engineers, Landis) <br />Task 2.2 Revlew Melding whir County <br />This meeting would take place to review progress and receive input from the county. The meeting would take <br />place after the preliminary design plans are reviewed by the ccunty. if the scope has changed, we will also <br />provide a new anticipated budget <br />Task 2.8 Construction Documents <br />Once review comments ere taken into account, the Construction Documents will be completed in preparaticn for <br />bidding. <br />-Main Tidal, Vertical Fiow system, including all connedksns bade into building and subsurface design (design <br />and specifications by Padia with review by Living Machine engineers and Landis) <br />-Plumbing and Electrical modificatbns (design and specNicegons by Podia Consulting) <br />- Arohitectural, egress, educational, and safety design issues (design and specifications by Innovative Design) <br />oraig. ca~uY~ uw,g M.aune o,w.,aa~o.~ow. <br />Y 'd 8984`gN N91S3~ 3AIlUAONNI Wdl9~l E08b '9 '^gN <br />
The URL can be used to link to this page
Your browser does not support the video tag.