Orange County NC Website
16 <br /> 1 Slide #5 <br /> Watersh ed s 8uckh o rn EDD& H i Ilsboro ugh EDD <br /> P <br /> ti <br /> } �• C v <br /> Haar Creek 1 <br /> ' J <br /> 1 � Lower Eno <br /> f, O _7 <br /> 1 <br /> J4rda n r <br /> Flaw rook i£le Cane Creek Lpkg: I <br /> nz%l <br /> �'p{ti JJC v` _ <br /> 2 uNS�k=ti� <br /> 3 Craig Benedict reviewed the information in the background materials regarding state <br /> 4 rules for watershed protection versus the higher amount Orange County. He said no EDDs are <br /> 5 located in critical watershed areas. He said that the Upper Eno watershed was designated a <br /> 6 critical area by Orange County. He said that in the late 1980s the county studied placing a <br /> 7 reservoir in the Upper Eno watershed, but that is no longer a consideration. <br /> 8 Craig Benedict referred back to slide #4. He said there is additional water and sewer <br /> 9 capacity through agreements with Mebane. He said that water and sewer lines built by the <br /> 10 county are now Mebane's responsibility to maintain. <br /> 11 Commissioner Richards asked for confirmation that the Upper Eno watershed is a <br /> 12 hypothetical area, which equates to six times more than what the state requires of the county <br /> 13 and is based on a theoretical reservoir that never came to fruition and will never come to be. <br /> 14 Craig Benedict said she was correct. He said the county has purchased a lot of <br /> 15 properties in that watershed for preservation purposes but there is no opportunity for a future <br /> 16 reservoir in that area. <br /> 17 Commissioner Richards asked for confirmation that it is county-owned land, designated <br /> 18 for preservation. She asked if she is correct that it would not be eligible for any development. <br /> 19 Craig Benedict said she was correct. <br /> 20 Commissioner Richards asked for confirmation that the West Ten Road sewer system <br /> 21 can be upgraded. <br /> 22 Craig Benedict said it can be upgraded. He said there is an upgrade planned to put <br /> 23 sewer under the interstate. He said that the engineering design pumps one way but, in the <br /> 24 future, they can pump to where there is more capacity. <br />