7
<br /> ■ BARNHILL FINAL GMP ALTERNATES SUMMARY
<br /> CONTRACTING March 8,2022
<br /> COMPANY The 203 Project
<br /> Carrboro,NC
<br /> Unburdened
<br /> Alternate No. Alternate Description Packages Affected Alternate Cost
<br /> A-1 Electrochromic Glazing BP840,BP1600 $ 161,650.00
<br /> BP642,BP925,BP930,BP960,BP965,BP980,
<br /> A-10 Shell Only:Performance Space,Level 1 BP990,BPI 110,BP1530,BP1540,BP1550,BP1600 $ (342,455.00)
<br /> BP642,BP925,BP930,BP960,BP965,BP980,
<br /> A-11 Shell Only:Orange County Skills work areas,Level 2&3 BP990,BP1530,BP1540,BP1550,BP1600 $ (264,539.32)
<br /> BP642,BP925,BP930,BP960,BP965,BP980,
<br /> A-12 I Shell Only:Orange County Library work area,Level 1 BP990,BP1530,BP1540,BP1550,BP1600 $ (480,265.21)
<br /> A-13 Shell Only:East Side of Level 1 BP642,BP925,BP930,BP960,BP965,BP980,BP990 $ (197,156.32)
<br /> A-14A Acoustical Ceiling Baffles: Increase Spacing,8"to 12"O.C. BP980 $ (59,254.00)
<br /> A-14B Acoustical Ceiling Baffles:Decrease Depth, 11.5"to 7.5"O.C. BP980 $ (55,396.00)
<br /> C-1 Omit Fiber Optic Cabling:adjacent to Maple and Carr BP2600 $ (60,980.00)
<br /> E-1 35 Additional"EV-Ready"parking spaces BP2600 $ 23,455.00
<br /> E-2 Electrical Panels associated with Alternate E-1 BP2600 $ 17,450.00
<br /> E-3 Photovoltaic Panels&Inverter Equipment-WEST ROOF BP1370 $ 178,000.00
<br /> E-4 Photovoltaic Panels&Inverter Equipment-EAST ROOF BP1370 $ 712,226,00
<br /> L-1 Soil Cells BP201,BP225,BP290 $ 38,683.00
<br /> QT-1 Theatrical Drapes&Associated Track BP1110 $ 36,900.00
<br /> QT-2 Telescoping Seating BP1240 $ 244,360.00
<br /> PBA/A-2 Corbin-Russwin Mortise Locksets BP800 $ -
<br /> PBA/A-3 Taylor Brick in Executive Gray BP400 $ 5,000.00
<br /> PBA/E-1 Communications Equipment BP1600 $ -
<br />
|