Orange County NC Website
BARNHILL ACTING GUARANTEED MAXIMUM PRICE 5 <br /> CONTRCOMPANY March 8, 2022 <br /> The 203 Project <br /> Carrboro, NC <br /> Building Area= 109,338 SQFT <br /> Amount Total CostISF <br /> Cost of the Work <br /> Subcontract Base Bid $28,796,5921 $0.00 <br /> Subtotal Cost of Work $28,796,5921 $28,796,5921 $263.37 <br /> Contingencies <br /> Construction Contingency 4.97% $1,505,178 $13.77 <br /> Subtotal Contingencies $1,505,178 $30,301,770 $277.14 <br /> General Conditions <br /> Labor $0 $0.00 <br /> Subtotal General Conditions LSUM $1,900,577 $32,202,347 $294.52 <br /> Bonds & Insurances <br /> CMAR Insurances & Bonds 2.10% $726,297 $6.64 <br /> Subcontractor Default Insurance 1.25% $359,957 $3.29 <br /> Subtotal Bonds & Insurances $1,086,254 $33,288,602 $304.46 <br /> Fees &Allowances <br /> Construction Management Fees 3.75% $1,296,959 $11.86 <br /> Subtotal Fees &Allowances $1,296,959 $34,585,560 $316.32 <br /> Cost of the Work with Accepted Alternates <br /> Accepted Alternates: <br /> E-1: EV-Ready Parking Spaces (Shared) $25,224 $0.23 <br /> L-1: Soil Cells (Town of Carrboro) $41,600 $0.38 <br /> QT-1: Theatrical Drapes (Town of Carrboro) $39,683 $0.36 <br /> PBA/A-2: Corbin-Russwin Mortise Locksets $0 $0.00 <br /> PBA/E-1: Communications Equipment $0 $0.00 <br /> Subtotal Cost of Work with Accepted Alternates $106,507 $34,692,0671 $317.29 <br /> GMP Total with Alternates $34,692,067 $317.29 <br />